background image

 

 

 

 

 

Installation procedure 

 

1. First steps 

 

1) Connect the WIFI, GPRS and GPS antennas in the Smart Spot Core Box. In the back of the Box

 

 

 

 

 

 

   

 

 

 

 

   

 

   

 

 

is indicated the position of each antenna 

2) Connect the Microphone in the Air Quality Extension Box 
3) Connect the Smart Spot Communication Cable to the Smart Spot Core Box and to the Air

 

 

 

 

 

   

 

 

 

 

 

   

 

 

Quality Extension Box 

4) Check that the antennas,  the microphone and the Cable are strongly screwed 
5) Locate the position in which the boxes are to be placed, and check that it is away from

 

 

   

 

 

 

   

 

 

 

 

     

 

 

possible  electromagnetic interference sources and pollution sources. 

6) Place the boxes in the possible location so that the Smart Spot Communication Cable is at the

 

 

   

 

 

   

 

 

 

 

 

     

 

bottom of the box and make sure that the are close enough so that the cable is not stressed. 

a) In case of mounting on a mast, place the Smart Spot Core Box over the Air Quality

 

   

     

 

 

 

 

 

 

 

 

 

 

 

Expansion Box (Figure 7) 

b) In wall mounting place the Smart Spot Core Box to the right of the Air Quality

 

 

 

 

 

 

 

 

   

 

   

 

 

 

Expansion Box (Figure 11) 

 
Once you have checked the location where the boxes will be fixed, continue with the following steps

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

depending of the installation type. 

c) In case of mounting on a mast, follow  the point 2.A 
d) In case of wall mounting, follow the point 2.B 

 
 

!

 

Check that the antennas, the microphone and the Cable are strongly screwed 

 

 

 

>  ​

8  ​

Summary of Contents for Air Quality

Page 1: ...INSTALLATION GUIDE...

Page 2: ...HOP Ubiquitous S L www hopu eu info hopu eu Luis Bu uel 6 30562 34 868 923 923 Ceut Murcia Spain 1...

Page 3: ...lation procedure 8 First steps 8 2 Box Attachment 9 2 A Installation on a Mast 9 2 A 1 Smart Spot Core Box 9 2 A 2 Air Quality Extension Box 10 2 B Installation on a Wall 11 2 B 1 Smart Spot Core Box...

Page 4: ...installation kit suitable both for installation on wall or pole Note that these enclosures will be united by means of a communication cable which provided of 35cm 60cm or 100cm depending of the instal...

Page 5: ...hed to adequate the voltage level to the Smart Spot The AC Adapter is provided in conjunction with the Smart Spot and the cable length is 1 2 meters long Figure 1 Optionally and depending on the confi...

Page 6: ...B as described on the normative to avoid the reflected noise Moreover to reach an accurate Air Quality monitoring the device should be installed avoiding nearby transformers and antennas that may caus...

Page 7: ...Air Quality Extension Box Anchor Elements 5 GPS Antenna 6 GPRS Antenna 7 WIFI Antenna 8 Microphone 9 AC Adaptor 10 Smart Spot Communication cable Figure 2 Cover and anchorage system details of Smart S...

Page 8: ...5 M4 Captive Screw 6 Spacer 18 mm 4pcs 7 Spacer 5mm 4 pcs 8 2 9 x 25mm screw 4 pcs 9 2 9 x 13mm screw 4 pcs 10 Body Figure 4 Smart Spot Core Box Anchor Elements Figure 5 Installation elements safety m...

Page 9: ...sources and pollution sources 6 Place the boxes in the possible location so that the Smart Spot Communication Cable is at the bottom of the box and make sure that the are close enough so that the cabl...

Page 10: ...Figure 7 Installation on a Mast 2 A 1 Smart Spot Core Box 1 Attach bracket to mast using hose clamps 2 Clamps shall be as much to the outer edge of bracket as possible 3 Secure the M4 screw Figure 8 S...

Page 11: ...using the screws as is indicated in the figure below Figure 9 2 Attach bracket to mast using the clamps Figure 10 Figure 9 Cover and anchorage system details of Smart Spot Air Quality Extension Box F...

Page 12: ...re 11 Installation on a Wall 2 B 1 Smart Spot Core Box 1 Attach bracket to the wall using wall plugs and screws Figure 12 2 Then install the enclosure and secure the M4 screw Figure 12 Smart Spot Core...

Page 13: ...l steps 1 Check that the boxes are well fixed 2 Ensure that the Smart Spot Communication cable does not cross with the GPRS antenna Use cable ties if it is necessary 3 Connect the AC adapter to the Sm...

Page 14: ...losures connections details Figure 14 Connection of Smart Spot Core Box and Smart Spot Air Quality Extension Box through the cable Figure 15 Smart Spot Air Quality Extension Box filters and connector...

Page 15: ...Figure 16 Smart Spot Air Quality Extension Box humidity control valve 14...

Page 16: ...res 18 and 19 The Smart Spot Core Box the Air Quality Expansion Box and the Microphone has an ID and this must be connected to others with the same ID If you have received several devices be sure to p...

Page 17: ...Examples of previous Smart Spot Installations SMART SPOT INSTALLATION ON WALL Urban 16...

Page 18: ...17...

Page 19: ...SMART SPOT INSTALLATION ON POLES Urban 18...

Page 20: ...SMART SPOT INSTALLATION ON POLES Industry 19...

Page 21: ...inks Homard Wiki https homard hopu eu indexPage wiki html Homard App http staging hopu eu Smartcities Dashboard https live hopu eu Smartcities Web http smartcities hopu eu Hop Ubiquitous Web http www...

Page 22: ...More information in User and Development Guides hopu eu 21...

Page 23: ...22...

Reviews: