background image

(4)

Installation instruction:

Step 1:

Notes the position for installation

in the tire carrier.

Step 2:

Take down the nuts in the Part A. Then insert Part B into the Part A

along the rod.

Step 3:

Place the Jerry Can Mount and Part A around the left side of the tire

carrier as the following picture shown. Then do some adjustment until it’s in

an ideal position and tighten up the nuts.

Reviews: