11. Reverse this procedure to install the new pump.
12. Replace the wire ties and dress the bundle in the wire guides.
13. Close the case. To maintain the detector’s IP rating, tighten the captive screws
[torque to 6.9 lbf-in ±0.4 (8kgf x cm ±0.5)] in the order shown in this illustration.
Figure 36.
1
4
6
5
2
3
Case screws tightening order.
14.
Reset all fault codes (Main menu > Reset Alarms & Faults > Reset All).
15.
Install a Chemcassette cartridge (see
“Installing a Chemcassette cartridge” on page
).
16. Navigate to Monitor mode. Depending on the gas being detected, the target
sample analysis flow rate should be between 250 cc/min and 500 cc/min (see
).
17.
Navigate to Review mode > Additional Status. The flow and pump drive values will
be displayed.
18.
Verify that the target flow has been reached. If it cannot be reached, a full flow
calibration must be performed. Contact Honeywell Analytics.
19.
Verify that the pump drive value is between 0-65%. If the pump drive value is not
within that range, contact Honeywell Analytics.
Checking the stepper motor
The detector will display an instrument fault in the event of a stepper motor
malfunction� See “
Instrument Fault/Maintenance Fault/Information Codes” on
�
Checking the gate motor
The detector will display an instrument fault in the event of a gate motor
malfunction� See
“Instrument Fault/Maintenance Fault/Information Codes” on
�
Summary of Contents for SPM Flex
Page 1: ...SPM Flex Single Point Monitor Gas Detector User Manual ...
Page 2: ......
Page 27: ...27 SPM Flex Gas Detector Setup Installation drawing Figure 18 Installation drawing ...
Page 70: ...70 SPM Flex Gas Detector ...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...SPM Flex Gas Detector User Manual 1998M0845 Revision 07 October 2016 2016 Honeywell Analytics ...
Page 77: ......