Honeywell PRO-2200 Installation Manual Download Page 14

PRO-2200 Enclosure PRO22ENC1 & PRO22ENC2

15

Installation Guide

6. Click Next. Change the Server to match the name of the LOCAL PC. The database

should be selected as WIN-PAK PRO from that Server. (The destination database).

7. Click Next. Select Transfer objects and data between SQL Server 7.0 database.

8. Click Next. Uncheck the Create destination objects box.

9. Click Next. Check the Create DTS package for replication box. Also check the Save

DTS Package box. Leave the radial button set for SQL Server. This menu saves the
replication using a DTS package which will be run when the user wants to keep the
database current with the MAIN PC.

10. Click Next. Change the name or accept the default for the local package being

created. Leave the Server name as LOCAL. Select either NT Authentication or SQL
Server Authentication, whichever matches your requirements.

11. Click Next. Select finish and DO NOT ABORT THIS PROCESS. This DTS process

will import all the data from the MAIN PC to the Redundant PC. When the transfer is
successful, click OK.

12. If a Publication Wizard opens select Cancel. Use the SQL Server Manual to utilize

this feature later, however it is not required for this setup. Click Done and minimize
Enterprise Manager.

Pre-Redundancy Verification:

1. Stop all the services on the MAIN PC.

2. Start services on the Redundant PC and launch the User Interface. Log in as ADMIN.

3. Verify that the data is consistent with the MAIN PC.

4. Verify communication with the hardware by using the Alarm View, Control Map or

Floorplans.

5. Next, close the user interface and stop the services on the Redundant PC.

DTS Package Verification

1. Maximize Enterprise Manager and locate the Data Transformation Services Folder.

Expand the folder and the click on Local Packages.

2. Find the Local Package that was created earlier. Double-click on the package to open

up the DTS menu. Select Package on the menu bar and then Execute.

3. The DTS package will run until it is done transferring the data from the MAIN PC to

the REDUNDANT one.

4. Follow steps 1-5 in the Pre-Redundancy Section on page 14.

Interim Steps Before Full Redundancy Verification

1. Shut down the Redundant PC.

2. Restart all the service on the MAIN PC. Launch the User Interface and verify that

communications have resumed.

Summary of Contents for PRO-2200

Page 1: ...PRO 2200 Enclosure Installation Manual Part Number PRO22ENC1 PRO22ENC2 TD1138 rev0801 ...

Page 2: ...nimum Requirements 12 Peripheral Hardware Requirements 12 Operating System Requirements 12 Software Packages Required 12 Receiving Unit minimum configuration 12 Priority of incoming signals for UL1076 12 Other UL1076 Notes 13 Procedures 13 Second PC Installation 14 Enterprise Manager Setup 14 Pre Redundancy Verification 15 DTS Package Verification 15 Interim Steps Before Full Redundancy Verificati...

Page 3: ...or other barrier Use of egress buttons for example may be illegal in some cities In most applications single action exit without prior knowledge of what to do is a life safety requirement Always make certain that any required approvals are obtained in writing DO NOT ACCEPT VERBAL APPROVALS THEY ARE NOT VALID Engineered Systems never recommends using the PRO 2200 or related products as a primary wa...

Page 4: ...tection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference that will require ...

Page 5: ...on with the acts or omissions of Customer and its agents and employees and from and against all claims demands losses and liability for costs of fees including reasonable attorneys fees in connection therewith Unpacking Procedure CAUTION If any damage to the shipment is noticed before unpacking a claim must be filed with the commercial carrier All containers should be opened and unpacked carefully...

Page 6: ...r prior to returning any Product for service repair credit or exchange Engineered Systems warrants that its Products shall be free from defects in materials and workmanship for a period of two years from date of shipment of the Product to Customer The warranty on Terminals Printers Communications Products and Upgrade kits is 90 days from date of shipment Satisfaction of this warranty shall be limi...

Page 7: ...t such information as confidential Customer shall acquire no rights in the design of Products or the related materials except to use such information solely for the purpose of and only during the time it sells Products Customer shall not copy the design of any Products or use or cause to be used any Product design or related materials for its own benefit or for the benefit of any other party The c...

Page 8: ...le backup battery Typically one of the nine modules can be an intelligent controller PRO22IC The remain ing eight slots can be used and configured in a variety of combinations of readers supervised inputs relay outputs and other specialized modules to customize the system for the individual site The PRO22ENC1 PRO22ENC2 can be configured in any combination of the PRO22IC PRO22IN PRO22OUT PRO22R2 an...

Page 9: ...0 is being mounted Use a rectangular screw pattern 12 1 0 30734 m H x 16 0 40640 m W Leave the screws exposed approximately 1 2 0 0127 m 2 Open the door of the enclosure and place the hanging slots over the mounting screws Push the enclosure over the mounting screws and allow the screws to slide into the slots Finish tightening the mounting screws to securely hold the enclosure 3 Run all appropria...

Page 10: ... power and RS 485 communications between panels is factory wired in a harness that plugs into the bottom two connectors on each panel The only field wiring required is the two wiring connections of the red and black 12 VDC cables connecting the PRO22DCC and the PRO22E1PS power supply Installation Diagram PRO22ENC1 PRO22ENC2 0 051 0 045 0 045 0 032 0 076 0 229 0 196 0 035 0 098 0 330 0 203 0 203 0 ...

Page 11: ...irements NT Server 4 0 or better NT Service Pack 5 or higher Software Packages Required SQL Server 7 0 SQL Server Service Pack 1 or higher WIN PAK PRO 3 0 with SQL database selection Receiving Unit minimum configuration PRO22ENC1 or PRO22ENC2 cabinet PRO22ULPS ALTRONIX AL400 ULX power supply with 40 AH battery back up PRO22IC controller panel PRO22IN input panel PRO22EN Cobox Ethernet card PRO22EN...

Page 12: ...ations are restored If Cameras are used they must be UL approved Camera operation was not verified by UL Guard Tour was not verified by UL to NFPA 72 standards Exit and Entry Delay can not exceed 60 seconds Polling of a receiving unit may not exceed 200 seconds Procedures 1 Configure the PC s by installing the NT Server 4 0 A PC names should be unique and described with Alpha characters B IP addre...

Page 13: ...mmed through the Cobox software C Program all the ADV s for the hardware so that you will be able to monitor the points and system alarms D Once the program is configured shut down the User Interface and restart all the services Launch the User Interface and verify communications E Program the Communications Server with Local Machine for the Node Name F Program a Control Map and or Floorplans with...

Page 14: ...OK 12 If a Publication Wizard opens select Cancel Use the SQL Server Manual to utilize this feature later however it is not required for this setup Click Done and minimize Enterprise Manager Pre Redundancy Verification 1 Stop all the services on the MAIN PC 2 Start services on the Redundant PC and launch the User Interface Log in as ADMIN 3 Verify that the data is consistent with the MAIN PC 4 Ver...

Page 15: ... into NT with Administrator rights 3 Launch the User Interface and log in as ADMIN 4 When the Alarm View pops up with Poll Response Normal stop the stop watch This time represents the amount of time that has passed since the MAIN PC went down Example 3 1 Unplug the network cable from the HUB for the MAIN PC Turn on the REDUN DANT PC and start the stop watch 2 Log into NT with Administrator rights ...

Page 16: ...50V Green Lead Battery connection non power limited Switch Position 24VDC SW1 OPEN 12VDC SW1 CLOSED SW1 Wire Strap from Enclosure to Door 115 power mains Fuse Strain Relief To Battery Enclosure with 40AH Battery AL400ULX Assembly diagram for use with the PRO22ENC1 and PRO22ENC2 for UL1076 Installation Diagram Dimensions 875 1 3 2 1 22 3 25 1 2 1 22 1 25 2 2 15 5 2 22cm 3 1cm 5 08cm 3 3cm 2 54cm 1 ...

Page 17: ...utput connections 7 CHECK ALL CONNECTIONS PRIOR TO POWERING UP THE ENCLOSURE AND PANELS 8 Wire the 12VDC AC Fail Battery Fail and tamper switch from the AL400ULX to the enclosure Make sure that the power supply is not powered up at the time 9 Wire the 12VDC to the Panel on the far right first making sure that the polarity of the wires are correct 10 Wire the tamper switch AC Fail and Battery Fail ...

Page 18: ...er to N 1000 II NC1861 BL 18 6 conductor shielded 500 152 m PR 3 PR 5 Indala readers A 3 A 5 read head to RE 2 NC18121 YL 18 12 conductor shielded 75 23 m RE 2 to N 1000 II NC1861 BL 18 6 conductor shielded 500 152 m PR 20 PR 22 Indala readers A 20 A 22 read head to RE 2 NC18121 YL 18 12 conductor shielded 75 23 m RE 2 to N 1000 II NC1861 BL 18 6 conductor shielded 500 152 m PR 10 PR 12 Indala rea...

Page 19: ...onductor power door cable 1 000 305 m NCC59206 BK RG 59 video cable 1 000 305 m NCP1841 GY 18 AWG 4 conductor Plenum reader cable 1 000 305 m NCP1861 BL 500 18 AWG 6 conductor Plenum reader cable 500 152 m NCP1861 BL 18AWG 6 conductor Plenum reader cable 1 000 305 m NCP18121 YL 18 AWG 12 conductor Plenum keypad cable 1 000 305 m NCP18121 YL 500 18 AWG 12 conductor Plenum keypad cable 500 152 m NCP...

Page 20: ...PRO 2200 Enclosure PRO22ENC1 PRO22ENC2 21 Installation Guide NOTES ...

Page 21: ...22 PRO 2200 Enclosure PRO22ENC1 PRO22ENC2 Installation Guide NOTES ...

Page 22: ...PRO 2200 Enclosure PRO22ENC1 PRO22ENC2 23 Installation Guide ...

Page 23: ...Honeywell Security Data Collection 2700 Blankenbaker Pkwy Suite 150 Louisville KY 40299 800 675 3364 www honeywellaccess com ...

Reviews: