MAXPRO NVR Commissioning and Installation Guide
19
1
Commissioning Plan
Overview
Commissioning is the process of installing, configuring, and setting up the MAXPRO NVR
system hardware and software. At the end of the commissioning process, the MAXPRO NVR
system is equipped for use by operators to perform video surveillance operations.
Steps in the Commissioning Process
The process of commissioning involves the following phases.
Setting up the MAXPRO NVR
Setting up the MAXPRO NVR involves:
•
Determining the number of MAXPRO
NVR server and client computers at the location.
•
Choosing the desired MAXPRO NVR system architecture.
•
Connecting the monitors to the MAXPRO NVR. After connecting the monitors, configure
the monitor display properties.
•
Connecting the keyboards (for example, Ultrakey) to the MAXPRO NVR unit.
Note:
See
Setting up the MAXPRO NVR
for information on how to setup the MAXPRO
NVR system.
Installing the Software in the Server and Client
Computers
Caution:
For the Honeywell’s boxed solutions: MAXPRO NVR PE, MAXPRO NVR
XE, and MAXPRO NVR SE, the server and client software required is
already installed on the box. Hence the instructions in this section for
server software fresh installation are
NOT
applicable.
Summary of Contents for MAXPRO 2.5
Page 1: ...Document 800 09355V5 04 2013 MAXPRO NVR 2 5 Commissioning and Installation Guide ...
Page 2: ...This page is intentionally left blank ...
Page 3: ...Revisions Issue Date Description 1 0 April 2013 New document ...
Page 4: ...This page is intentionally left blank ...