
Dual Node Module Service
6-1
9/95
6
STARTUP
Section 6
6.1 VISUAL CHECKS
• Check the Module power and signal cables to ensure that they are present and tight.
• Check the ground strap on rear of chassis for good connection.
• Ensure that all boards and power supply(s) are fully inserted into the connectors and that
board retainers are secured.
6.2 INITIALIZE NODE
• Turn the power on by pressing the “1” side of the power switch. After 2 minutes or
less, all red LEDs should be off and all green LEDs should be on, and the alphanumeric
display should indicate the address of the node. If not, check indicators and LEDs in
accordance with subsection 3.2, Test Procedures.
• If this is not a History Module, press the
RESET
* button. Check displays and LEDs as
above.
W A R N I N G
* In the case of the History Module only, if you press the RESET button indiscriminately while
the system is operating, you may cause damage to the data stored on the hard disk. See
subsection 3.2,
Troubleshooting, in the History Module Service manual, part of the LCN
Service binder, for complete details.
NOTE
When you replace or restart a board or module with an outstanding maintenance
recommendation, be sure to make an SMCC corrective action entry. Otherwise, the system
will not start a recount of errors. See the
System Maintenance Guide in the LCN Service
binder for additional information on this procedure.
Summary of Contents for LC13-510
Page 1: ...L Dual Node Module Service LC13 510 ...
Page 2: ......
Page 3: ...L LCN Service 2 Dual Node Module Service LC13 510 Release 500 CE Compliant 9 95 ...
Page 10: ...Dual Node Module Service 1 2 9 95 ...
Page 50: ...Dual Node Module Service 3 14 9 95 ...
Page 58: ...Dual Node Module Service 6 2 9 95 ...
Page 75: ......