Dual Node Module Service
2-22
9/95
2.9
2.9 PRECISION CLOCK PINNING (POWER SUPPLY REPLACEMENT)
The power supply has a pinning option for internal or external clock (see Figure 2-11). It
is pinned for internal clock unless the Precision Clock Source option is installed.
If you are replacing the power supply, check the pinning on the old supply and ensure that
the replacement is pinned the same.
Location of
the Jumper
J1
2
Position 2
Position 1
Power
Cntl
Pwr
Reset
Error
Voltage
Margin
Nom
Hi Lo
Position 2 = Internal Clock
Position 1 = External Clock
Figure 2-11 — Power Supply Showing Location of Clock Jumper
4242
Summary of Contents for LC13-510
Page 1: ...L Dual Node Module Service LC13 510 ...
Page 2: ......
Page 3: ...L LCN Service 2 Dual Node Module Service LC13 510 Release 500 CE Compliant 9 95 ...
Page 10: ...Dual Node Module Service 1 2 9 95 ...
Page 50: ...Dual Node Module Service 3 14 9 95 ...
Page 58: ...Dual Node Module Service 6 2 9 95 ...
Page 75: ......