
www.honeybeecnc.com
9
Dalian
Honeybee
CNC
Equipment
Co.,Ltd.
Tel:
+86
411
85865100
Fax:+86
411
85866100
Picture 6: Sliding of the Central Unit on the Rails
3.2.3 Cross Beam Assembly Installation (X Axis)
—Handle with care the Cross Beam assembly to avoid any damage to the flexible gas pipes, the
electromagnetic valve and the torch assembly.
—Hold the Cross Beam parallel to the floor and perpendicular to the Anti-heat Wall. Notice the rack
direction must match with the notch of the Central Unit, as picture 8.
—Insert the Cross Beam into the Central Unit, exercise a small force on it, make the rack of Cross Beam
match well with the gear of the Central Unit.
Picture 7