-6-
Step 7
•
Remove the 4 pre-assembled screws from the
head assembly and attach the post with these 4
screws.
• Remove the pre-assembled screws from the post
and attach to the post support using those 4
screws.
Step 8
NOTE: Leave all screws and nuts loose until the entire
reflector is put together in order to ensure proper
alignment of all sections.
•
Slide two pieces of the reflector together. Insert
one small screw. Repeat until all pieces of the
reflector are connected.
•
Place cap nuts on the screws.
•
Place the reflector center plate into the middle of
the reflector panels and repeat this procedure.
Step 9
•
Slide three large flat washers over the threaded
end of the studs.
•
Place the reflector assembly over the studs and
flat washers.
•
Place three more flat washers over the studs and
secure the reflector in place using three wing
nuts.
Step 10
•
You must provide propane gas and propane
cylinder. Use a standard 20 lb. propane cylinder
only.
• Use this heater only with a propane vapor
withdrawal supply system. See chapter 5 of the
Standard for Storage and Handling of Liquefied
Petroleum Gas, ANSI/NFPA 58. Your local library or
fire department should have this book.
• The minimum permissible gas supply pressure of 10
standard 20 lb. tank W.C. is required for purpose of
input adjustment.
•
The minimum hourly of 1700 Btu is required input
rating for a heater for automatic operation at
ratings less than full input rating. The pressure
regulator and hose assembly supplied with the
appliance must be used.
• The installation must conform with local codes, or
in the absence of local codes, with National Fuel
Gas Code, ANSI Z223.1.
WARNING:
Remove the protective cover before assembly.