11
The voltage required in the technical data sheet
must correspond to the existing line voltage.
Make sure that the electrical installations are in accor-
dance to electrical standard safety regulations applying in
your country.
The end of the pump power supply cable must not be
submerged in order to prevent water from penetrating
through the cable into the motor.The electrical connection
of the pump should be carried out in accordance with local
requirements and regulations.
The operating voltage and frequency are marked on the
pump and controller nameplates. Voltage tolerance : +6%
up to -10% of the voltage stated on the nameplates. Make
sure that the lifting station is suitable for the electricity sup-
ply available at the installation site.
The lifting stations require no additional motor protection.
Connect the units to the mains supply.
7. Installation
The operator has to prevent damage through the flood-
ing of rooms caused by defects of the pump through the
use of appropriate measures (e.g. installation of alarm
units, backup pump or the like).
Install the disposal unit Saniflux horizontal on an even floor.
In order to allow low noise operation, the distance between
the unit and the wall should be 0,5 cm min.
(Pic 1) Place the toilet in front of the unit and push the WC-
spigott into the socket of the box. Please make sure that
the front of the tank will not be pressed in.
To connect additional sanitary units (e.g. a shower) install a
DN 40 discharge hose from the outlet of the sanitary unit to
one of the inlets of the box. Please pay attention to give the
required gavity fall.
.
(Pic.2) Remove the cap, which is screwed on the inlet and
take the black sealing ring and the white plastic ring out of
the cap.
Summary of Contents for Saniflux Series
Page 16: ...16 ...