6.2. Maintenance schedule

Every six months:

•  Visual inspection of the power supply leads

•  Visual inspection of the cable holders and the wiring

•  Visual inspection of accessories, such as for example 

suspension device, lifting devices, etc.

6.3. Maintenance work

Visual inspection of the power supply leads

The power inlet leads must be inspected for bubbles, 

cracks, scratches, scour marks and/or crushing zones. 

If damages are detected, the damaged power inlet lead 

must be replaced immediately.

The leads may only be replaced by the manufacturer 

or an authorized/certified service workshop. The ma-

chinery must only be started after appropriate repair 

of the damage!

Visual inspection of the cable holders (biners) and the 

wiring (traction cable)

If the machine is used in basins/shafts the hoisting wires/

cable holders (biners) and the wiring are subject to con-

stant wear and tear. Regular inspections are required to 

prevent a complete wear and tear of the hoisting wires/

cable holders (biners) and/or wiring and a complete dam-

age to the power cable.

The hoisting wires/cable holders (biners) and the wir-

ing must be replaced immediately if there are slight 

signs of tear and wear!

Visual inspection of accessories

The accessories, such as for example suspension devic-

es, lifting devices, etc. must be checked for correct fitting. 

Loose or defective accessories must be repaired/replaced 

immediately.

7. Repairs

7.1. General

The following repairs can be carried out on this machine:

•  Changing the impeller and pump unit

•  Changing wear rings

When carrying out repair work, the following information 

should always be noted:

•  Round sealing rings as well as existing seals should 

always be replaced.

•  Screw fixings such as spring washers should always 

be replaced.

•  The correct torques must be observed.

In general, the following applies to repairs:
Switch off the machine, disconnect it from the mains 
(have this done by an electrician), clean it and place 
it on a solid base in a horizontal position. Secure it 
from falling over and/or slipping.

If not otherwise stated, the torque values of the 

 

below tables should be used. Values stated are for clean,  

lubricated screws. Fixing torque [Nm] for screws A2/A4  

(Coefficient of friction = 0,2)

A2/A4,

Hardeness class 70

A2/A4,

Hardeness class 80

DIN912/DIN933

DIN912/DIN933

M6

7 Nm

11,8 Nm

M8

17 Nm

28,7 Nm

M10

33 Nm

58 Nm

M12

57 Nm

100 Nm

M16

140 Nm

245 Nm

M20

273 Nm

494 Nm

7.2. Changing the impeller and pump unit

Changing the impeller and the pump unit.

•  Loosen and remove the screws on the sealing 

 

housing.

•  Secure and remove the pump housing from the  

sealing housing with suitable equipment, e.g. 

 

hoisting gear. Place on a secure base.

•  Fasten the impeller with suitable equipment, loosen 

and remove the impeller fastening (cylindrical screw 

with socket hex).

Pay attention to the locking screw!

•  Remove the impeller from the shaft using a suitable 

extractor.

•  Cleaning the shaft

•  Attach a new impeller to the shaft.

Summary of Contents for H 307

Page 1: ...Original Betriebsanleitung EN Original Instruction Manual FR Manuel d instructions original NL Originele handleiding H307 H313 H328...

Page 2: ...2 Einsatzarten 08 3 3 Aufbau 08 4 Verpackung Transport und Lagerung 10 4 1 Anlieferung 10 4 2 Transport 10 4 3 Lagerung 10 4 4 R cklieferung 10 5 Aufstellung und Inbetriebnahme 11 5 1 Allgemein 11 5 2...

Page 3: ...um Unfall schutz und zur Unfallverh tung Diese Betriebsanleitung muss dem Bedienpersonal jederzeit am Einsatzort des Produktes verf gbar sein 1 3 Bestimmungsgem e Verwendung Die HOMA Produkte entsprec...

Page 4: ...ese Vereinbarungen laufen mindes tens bis zum vereinbarten Ende der Gew hrleistungszeit des Produktes 1 5 2 Ersatzteile An und Umbauten Es d rfen nur Originalersatzteile des Herstellers f r Reparatur...

Page 5: ...die Maschine 3 Minuten betrieben werden kann und anschlie end 7 Minuten abk hlen muss Schl rfbetrieb Der Schl rfbetrieb kommt einem Trockenlauf gleich Die Pumpe l uft mit voller Drehzahl es werden ab...

Page 6: ...h ngende Lasten ber Arbeitspl tze zu bewegen an denen sich Personen aufhalten Beim Einsatz von mobilen Arbeitsmitteln zum Heben von Lasten muss wenn n tig z B Sicht versperrt eine zweite Person zum K...

Page 7: ...Einsatz m s sen die Pumpen bestimmte Richtlinien erf llen Ebenso m ssen bestimmte Verhaltensregeln und Richtlinien vom Betreiber eingehalten werden Pumpen welche f r den Einsatz in explosiven Atmosph...

Page 8: ...gt Bitte entnehmen Sie die genauen Daten der Tabelle in Kapitel 3 3 2 Motor 3 3 Aufbau Das voll berflutbare Aggregat besteht aus dem Motor dem Pumpengeh use und dem passendem Laufrad Alle wichtigen Ba...

Page 9: ...en im Uhrzeigersinn anl uft START REACTION ROTOR REACTION ACHTUNG Wenn sich das Laufrad im Uhrzeigersinn dreht von oben gesehen ist die richtige Drehrichtung gegeben ACHTUNG Die Start Reaktion l uft g...

Page 10: ...kni cken Besch digungen und Feuchtigkeitseintritt zu sch tzen Gefahr durch elektrischen Strom Durch besch digte Stromzuf hrungsleitungen droht Lebensgefahr Defekte Leitungen m ssen sofort vom qualifiz...

Page 11: ...g der Pumpe haben Hierf r ist der Betreiber verantwortlich Ein Trockenlauf ist strengstens untersagt Wir empfehlen daf r eine Niveausteuerung Verwenden sie Prallbleche f r den Zulauf So unterbinden Si...

Page 12: ...tpunkt gesunken schaltet der Schwimmer die Pumpe ab Der Schaltabstand d h die Wasserstandsdifferenz zwischen Ein und Ausschaltpunkt l sst sich individuell bestimmen F r eine einwandfreie Funktion beac...

Page 13: ...bsenken bzw Eintauchen in das F rdermedium entfernt werden Bitte berpr fen Sie folgende Punkte Kabelf hrung keine Schlaufen leicht gestrafft Temperatur des F rdermediums und Eintauchtiefe pr fen siehe...

Page 14: ...ten so empfehlen wir den zus tzlichen Einbau von Schutzeinrichtungen z B berspannungs Unterspannungs oder Phasenausfall relais Blitzschutz usw Beim Anschluss der Maschi ne m ssen die rtlichen und gese...

Page 15: ...triebsmedien z B le Schmierstoffe usw sind in geeigneten Beh lter aufzufangen und vorschrifts m ig zu entsorgen gem Richtlinie 75 439 EWG und Erlasse gem 5a 5b AbfG Bei Reinigungs und Wartungsarbeiten...

Page 16: ...efestigung Zylinderschraube mit Innensechskant l sen und herausdrehen Achten Sie auf die Schraubensicherung Das Laufrad mit einem geeigneten Abzieher von der Welle abziehen Welle reinigen Neues Laufra...

Page 17: ...f einem festen Untergrund vertikal abstellen und gegen Umfallen sichern Bei Pumpen muss der Druck und Sauganschluss mit geeigneten Hilfsmitteln z B Folie verschlossen wer den Die elektrische Anschluss...

Page 18: ...reinigen bzw wieder gangbar machen Dichtraumkontrolle optional hat den Stromkreis unterbrochen Betreiber abh ngig Siehe St rung Leckage der Gleitringdichtung Dichtraumkontrolle meldet St rung bzw scha...

Page 19: ...topft Saugstutzen sieb und oder Laufrad Propeller reinigen Laufrad schwerg ngig Maschine abschalten gegen Wiedereinschalten sichern Laufrad gangbar machen Unzul ssiger Gehalt an Gasen im F rdermedium...

Page 20: ...ngseinrichtungen sind dann mit dem Lastkabel ausgef hrt Aderbezeichnung Motor berwachungseinrichtung berwachungen in der Wicklung T1 T2 Temperaturbegrenzer 2 Schalter in Reihe T1 T3 Temperaturregler 2...

Page 21: ...DEUTSCH 21 Notizen Notes...

Page 22: ...se 28 3 3 Construction 28 4 Package Transport Storage 30 4 1 Delivery 30 4 2 Transport 30 4 3 Storage 30 4 4 Returning to the supplier 30 5 Installation and Start Up 31 5 1 General 31 5 2 Installation...

Page 23: ...also be made available where the product is used 1 3 Proper use The HOMA products comply with the valid safety regula tions and meet the demands of state of the art technolo gy In the event of imprope...

Page 24: ...r repairs replacements add ons and conversions Only these parts guarantee a long working life and the highest level of safety These parts have been specially designed for our products Self made add on...

Page 25: ...uct on or off depending on the filling level This is made possible by installing a float switch 2 Safety This chapter lists all the generally applicable safety instruc tions and technical information...

Page 26: ...connec tion data sheet must be observed when connecting the product The technical specifications must be strictly adhered to If the machine has been switched off by a protective device it must not be...

Page 27: ...s e g suspension unit and pipeline operating site im mersion depth etc Once the product has been installed we recommend that the operator make additional mea surements under all operating conditions C...

Page 28: ...he motor and the pump housing as well as the impeller which belongs to it All important parts of the pump are characterized by generous dimen sioning No Description 1 Cable 2 Handle 3 Float switch 4 T...

Page 29: ...ION ATTENTION The direction of rotation is correct if the impeller propeller rotates in a clockwise manner when viewing down from top of the placed unit ATTENTION The start reaction is anti clockwise...

Page 30: ...ore storage to prevent impurities The power supply cables should be protected against kinking damage and moisture Beware of electrical current Damaged power supply cables can cause fatal inju ry Defec...

Page 31: ...on The operator or supplier is responsible for the provision Never let the unit run dry Therefore we recommend installing a level control unit Use defector plates for the pumped fluid intake that air...

Page 32: ...ng The start level must in any case be below the bottom of the liquid inlet pipe of the pit The high alarm level if a separate float switch for that is installed should be adjusted approx 10 cm above...

Page 33: ...ertain that the current consumption remains uniform during all phases Make sure that all temperature sensors and monitoring devices such as the sealing chamber monitor are con nected and that their fu...

Page 34: ...g instructions must be available to the maintenance personnel and must be followed Only maintenance work and measures listed here must be carried out All maintenance work inspection work and cleaning...

Page 35: ...be repaired replaced immediately 7 Repairs 7 1 General The following repairs can be carried out on this machine Changing the impeller and pump unit Changing wear rings When carrying out repair work t...

Page 36: ...ing information concerning storage 9 Troubleshooting In order to prevent damage or serious injury while rectify ing machine faults the following points must be observed Only attempt to rectify a fault...

Page 37: ...ting of the trigger with the technical specifications and adjust it if necessary Increased power consumption due to major voltage drop Have an electrician check the voltage on each phase and rewire if...

Page 38: ...s Defective motor bearing Contact the factory The machine is installed with mechanical strain Check the installation use rubber spacers if necessary Mechanical shaft seal leaks sealing chamber monitor...

Page 39: ...ring devices are run from the power cable Cable identification Motor Monitoring system Monitoring in winding T1 T2 Temperature limiter 2 switches in series T1 T4 Temperature controller 2 switches in s...

Page 40: ...onstruction 46 4 Emballage transport et stockage 48 4 1 Livraison 48 4 2 Transport 48 4 3 Stockage 48 4 4 Retour de livraison 49 5 Installation et mise en service 49 5 1 G n ralit s 49 5 2 Montage 50...

Page 41: ...e les accidents et la pr vention des accidents La pr sente notice d utilisation doit tre en permanence la disposition du personnel op rateur sur le site d utilisation du produit 1 3 Utilisation confor...

Page 42: ...ande Ces conventions courent au moins jusqu la fin convenue de la p riode de garantie du produit 1 5 2 Pi ces de rechange ajouts et transformations Seules des pi ces de rechange originales du fabrican...

Page 43: ...s Mode d exploitation S1 fonctionnement continu Sous charge nominale une temp rature constante qui ne peut plus augmenter m me en cas de fonctionnement prolong est atteinte Le mat riel peut fonctionne...

Page 44: ...diatement l apparition de toute d faillance ou irr gularit son responsable Un arr t imm diat par l op rateur est imp rativement n cessaire lorsque des d fauts qui mettent en p ril la s curit apparais...

Page 45: ...le du personnel est responsable du respect des prescriptions Pendant l exploitation des l ments d termin es rotor h lice tournent pour pomper l agent Des substances d termin es peuvent entra ner la fo...

Page 46: ...cas de garniture m canique d tanch it d fectueuse Danger d aux agents explosifs Le pompage d agents explosifs p ex essence k ros ne etc est strictement interdit Les produits ne sont pas con us pour ce...

Page 47: ...s du moteur Facteur de service 1 15 Mode d exploitation pour moteur immerg S2 30min S3 50 Temp rature admissible de l agent 90 C Classe d isolation H 180 C Indice de protection IP68 Longueur de c ble...

Page 48: ...Apr s son arriv e v rifier imm diatement si l envoi pr sente des dommages et est complet En cas de d fauts ventuels le transporteur ou le fabricant doit en tre inform le jour m me de l arriv e du pro...

Page 49: ...e les l ments en lastom re et les re v tements sont soumis une fragilisation naturelle Pour un entreposage de plus de 6 mois nous recommandons de les surveiller et de les remplacer si n cessaire Veuil...

Page 50: ...le pied d accouplement au fond du puits avec des chevilles pour charge lourde Veiller la position parfaitement horizontale du pied d accou plement Si le fond du puits n est pas plane soutenir la surfa...

Page 51: ...soulevez la pompe lentement et en la contr lant Dirigez ensuite la pompe au dessus du local d exploi tation et descendez la prudemment Si vous utilisez un dispositif d accrochage respectez aussi le ch...

Page 52: ...rs monophas s un contr le du sens de rotation n est pas n cessaire tant donn qu ils tournent toujours dans le sens de rotation correct Pour les moteurs triphas s le sens de rotation doit tre v rifi av...

Page 53: ...les points suivants La notice d utilisation doit tre disponible pour le per sonnel de maintenance et tre respect e par celui ci Seuls les travaux et mesures de maintenance men tionn s ici peuvent tre...

Page 54: ...ou remplac s imm diatement 7 Travaux de r paration 7 1 G n ralit s Les travaux de r paration suivants sont possibles pour cette machine Remplacement du rotor et de la chambre de pompage Remplacement d...

Page 55: ...te l emploi En cas de p riodes d immo bilisation prolong es une marche de fonctionnement de 5 minutes doit tre effectu e intervalles r guliers tous les mois tous les trimestres Attention Une marche d...

Page 56: ...s de surveillance V rifier la souplesse du rotor de l h lice et les nettoyer si besoin et les d bloquer Le contr le de l espace d tanch it en option a interrompu le circuit lectrique d pend de l explo...

Page 57: ...h lice obstru e Nettoyer les tubulures d aspiration cr pine d aspiration et ou rotor h lice Rotor gripp Arr ter la machine la s curiser contre le red marrage d bloquer le rotor Teneur en gaz inadmiss...

Page 58: ...ignation des conducteurs du moteur Dispositif de surveillance Surveillances dans l enroulement T1 T2 Limiteurs de temp rature 2 interrupteurs en s rie T1 T4 R gulateurs de temp rature 2 interrupteurs...

Page 59: ...FRANCAIS 59 Notizen Notes...

Page 60: ...sport en opslag 68 4 1 Aanlevering 68 4 2 Transport 68 4 3 Opslag 68 4 4 Retourneren 69 5 Opstelling en inbedrijfstelling 69 5 1 Algemeen 69 5 2 Installatie 70 5 3 Toepassing van kettingen 71 5 4 Inbe...

Page 61: ...evallenpreventie en of breidt deze uit Deze handleiding moet altijd beschikbaar zijn voor het bedie ningspersoneel op de werkplek van het product 1 3 Beoogd gebruik De HOMA producten voldoen aan de ge...

Page 62: ...afspraken lopen ten minste tot aan het overeengekomen einde van de wettelijke garan tietermijn van het product 1 5 2 Onderdelen aan en ombouwwerkzaamheden Er mogen uitsluitend originele onderdelen va...

Page 63: ...tieve inschakelduur en de cyclusduur indien deze afwijkt van 10 min Voorbeeld S3 30 betekent dat de machine 3 minuten in bedrijf kan zijn waarna er een afkoeltijd van 7 minuten moet volgen Slurpbedrij...

Page 64: ...n aanslagmiddelen zorgvuldig worden bewaard Mobiele werktuigen voor het tillen van lasten moet zodanig worden gebruikt dat de stabiliteit van het werktuig tijdens gebruik gewaarborgd is Tijdens de toe...

Page 65: ...ing gecontroleerd zijn Houd er hiervoor ook rekening mee dat voor bepaalde inrichtingen een analysetoestel of relais nodig is voor een probleemloze werking bijv PTC weerstanden en PT100 voelers Dit an...

Page 66: ...maximaal 90 C bedragen De maximale dichtheid van de vloeistof ligt bij 1100 kg m en de pH waarde mag 6 11 bedragen 3 2 Toepassingswijzen De pompen zijn voor bedrijfswijze S 2 kortstondig bedrijf of S...

Page 67: ...che vlotter Draairichtingscontrole Bij eenfasemotoren is geen controle nodig omdat deze altijd met de juiste draairichting draaien Driefasenmotoren hebben de juiste draairichting bij aan sluiting op e...

Page 68: ...h bij de werkzaamheden aan alle nationaal geldende veiligheids voorschriften houden De producten worden door de fa brikant of de toeleverancier in een geschikte verpakking aangeleverd Deze sluit norma...

Page 69: ...een natuurlijke verbrossing Wij adviseren deze bij een opslag van meer dan 6 maan den te controleren en indien nodig te vervangen Overleg hiervoor met de fabrikant 4 4 Retourneren Producten die worden...

Page 70: ...ten exact verticaal staan Koppelingsvoet met ankers voor zware belasting aan de putbodem be vestigen Let op een exact horizontale positie van de koppelingsvoet Bij ongelijke putbodem steunvlak op de j...

Page 71: ...Het andere uiteinde bevestigt u aan het hijswerktuig Span de ketting en til de pomp langzaam en gecon troleerd op Zwenk de pomp vervolgens boven de bedrijfsruimte en laat hem voorzichtig zakken Zie bi...

Page 72: ...elek tricien worden aangesloten 5 7 Draairichting Bij eenfasemotoren is een controle van de draairichting niet noodzakelijk omdat deze altijd met de juiste draairich ting draaien Bij driefasenmotoren...

Page 73: ...worden uitgevoerd die hier worden vermeld Alle onderhouds inspectie en reinigingswerkzaam heden aan de machine en de installatie moeten met grote zorgvuldigheid op een veilige werkplek en door gescho...

Page 74: ...iddellijk worden gerepareerd of vervangen 7 Reparatiewerkzaamheden 7 1 Algemeen De volgende reparatiewerkzaamheden zijn bij deze machine mogelijk Vervangen van waaier en pompkamer Vervangen van slijtr...

Page 75: ...re stilstandtijden moet regelmatig elke maand tot elk kwartaal een cyclusloop van 5 minuten worden uit gevoerd Pas op Een cyclusloop mag alleen onder de geldende bed rijfs en gebruiksvoorwaarden plaat...

Page 76: ...resp laten instellen bewakingscontroles resetten Waaier propeller op soepe le loop controleren en indien nodig reinigen of weer soepel maken Controle van de afdichtkamer optioneel heeft het stroomcir...

Page 77: ...korf en of waaier propeller reinigen Waaier draait niet soepel Machine uitschakelen beveiligen tegen opnieuw inschakelen zorgen dat waaier kan draaien Ontoelaatbaar gehalte aan gassen in de vloeistof...

Page 78: ...jn dan met de hijskabel uitgevoerd Aderaanduiding motor Bewakingscontrole Bewakingen in de wikkeling T1 T2 Temperatuurbegrenzer 2 schakelaars in serie T1 T4 Temperatuurregelaar 2 schakelaars in serie...

Page 79: ...bedingte Kontaminierung des Ger tes toxisch nein ja welche Stoffe tzend nein ja welche Stoffe mikrobiologisch nein ja welche Stoffe explosiv nein ja welche Stoffe radioaktiv nein ja welche Stoffe sons...

Page 80: ...the instruments toxic no yes substance corrosive no yes substance microbiological no yes substance explosive no yes substance radioactive no yes substance other substances no yes substance Legally bi...

Page 81: ...ti res corrosives non oui substance mati res micro biologiques non oui substance mati res explosives non oui substance mati res radioactives non oui substance autres substances non oui substance D cla...

Page 82: ...tourneren Contaminatie van het apparaat als gevolg van de toepassing giftig nee ja welke stoffen bijtend nee ja welke stoffen microbiologisch nee ja welke stoffen explosief nee ja welke stoffen radioa...

Page 83: ...83...

Page 84: ...Industriestra e 1 53819 Neunkirchen Seelscheid Telefon 49 0 2247 702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de Internet www homa pumpen de FIND US ON FACEBOOK facebook com homapumpen Version...

Reviews: