ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
26
ZX40PC
ASSEMBLY
16.1
Preparatory Activities
16.1.1
Checking Delivery Content
After unpacking, check the machine immediately after receipt of the delivery for transport
damage or missing or damaged parts. Always make a note of visible transport damage on the
delivery note and immediately report any damage to the machine or missing parts to your dealer
or freight forwarder.
16.1.2
Selecting the Installation Location
N O T E
Inaccuracies in the levelling of the machine lead to uneven loading of the gearbox,
spindle, ball bearing, etc. Negative effects on the service life of the machine are the
result. Therefore, align the machine carefully. Once the machine has been fixed, the
tolerance for skewness permitted for operation of the machine is 0.04/1000 mm, to
be measured in the transverse and longitudinal directions.
The machine is heavy. Therefore, make sure that the floor at the installation location is straight
and can carry the load of the machine.
The required depth depends on the hardness / consistency of the substrate – Note: less hard the
substrate requires a greater anchoring depth.
The space required by the machine is determined by its dimensions plus a safety area of around
80 centimetres in all directions around the machine.
In addition, a power supply connection is required at the installation site!
16.1.3
Preparation of Surfaces
N O T E
The use of paint thinners, petrol, aggressive chemicals or abrasives leads to material
damage to the surfaces!
Before start-up, use a mild detergent to remove the anticorrosive agent applied to the blank parts
of the machine to protect them from corrosion.
16.2
Electrical Connection
W A R N I N G
Dangerous electrical voltage! Connection of the machine as well as electrical
inspections, maintenance and repairs may only be carried out by qualified personnel
or under the supervision and supervision of a qualified electrician!
N O T E
Check the correct running direction of the spindles immediately after making the
electrical connection! If necessary, you must replace two of the three phases (L1, L2,
L3)!
The machine is operated with high voltage current (380 V, 3~, 50 ± 1 Hz). The use of 16 A fuses
is recommended.