OPERATION
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
21
HUB15FLEX_24V; HUB15MOVE_24V
3.
Connection of the plug.
N O T I C E
Take care of a correct cable installation, see
scetch.
15.2.2
Assembly Hub15Move
1.
Align the holes of the tiller arm (1) and hydraulic
system and insert the axle (3) - see sketch. The
locking pins (4) should be well clamped in the holes
on each side of the pump casing.
2.
Guide the chain with the
adjusting screw and the adjusting
nut through the hole of the axle.
3.
bring tiller arm to lowest position
tilt down and remove locking pins.
4.
Connect the plug.
N O T I C E
Achten sie auf eine korrekte Kabelführung, siehe
Skizze
OPERATION
16.1
Generell
To start the machine, the emergency stop switch must be unlocked.
N O T I C E
Do not operate the machine with a low battery charge under 30%.
Summary of Contents for HUB15FLEX 24V
Page 33: ......