
ASSEMBLY
HOLZMANN MASCHINEN Austria www.holzmann-maschinen.at
Seite 34
METALLDREHMASCHINE / METAL TURNING LATHE ED 1000G / GDIG
12.3
Electrical connection
A T T E N T I O N
When working on an ungrounded machine:
Serious injury due to electric shock in the event of a malfunction possible!
Therefore: appliance must be grounded and operated on a grounded outlet can be
The electrical connection of the machine is ready for operation on a grounded outlet!
If a plug is supplied, this must only be connected to a properly fitted and grounded electrical
outlet!
The plug (if supplied) must not be changed. If this does not fit or is defective, only a qualified
electrical engineer may modify or replace the plug!
The grounding conductor is green-yellow!
In the event of repair or replacement of the grounding conductor must not be connected to an
under voltage can!
Check with a qualified electrician or service that the grounding instructions are understood and
the machine is grounded!
A damaged cable must be replaced immediately!
12.4
Lubrication
Check the lubrication of the following parts before working on the machine:
12.4.1
Headstock
The bearing of the spindle is situated in an oil bath. Make sure that the oil level is always
reached the mark of the sight glass. To change the oil you drain the oil through development
of remote drain plug at the bottom of the headstock. To replenish the oil again, remove the
cover of the headstock. Check the oil level regularly. The first oil change should be performed
after 3 months, then you should change the oil once a year.
12.4.2
Gear
Remove the cover to expose the Nachfüllhahn. The first oil change should be made after three
months, then changes once a year is sufficient.
12.4.3
Lock case
The oil bath must filled with gear oil ISO 220. Add oil through the feed tube. Check the oil level
using the oil sight glass on the front page. The first oil change should be made after three
months, then changes once a year is sufficient. To drain the oil, remove the drain plug at the
bottom of the skirt.
12.4.4
Gearbox
Lubricate the gear once a month with the right machine oil or grease.
Summary of Contents for ED 1000G
Page 89: ......