background image

  

WARNING

 DO NOT CUT OR REMOVE THIS PLUG OR GROUNDING PRONG FROM THE 

PLUG.

  

WARNING

 CONNECT/PLUG UNIT INTO DEDICATED A.C. LINE ONLY SPECIFIED ON THE 

DATA PLATE OF THE UNIT.

DAILY OPERATION

ROTARY POWER SAVER SWITCH 

 For toasters equipped with a Rotary Power Saver Switch, turn clockwise or counterclockwise 

to get in the following positions.

 FULL POWER

 When in this position your equipment is at full power and ready to use.

 OFF ROTARY

Two off positions are provided, a single rotation to either direction will shut the unit off.

 STANDBY

The standby position reduces the power consumption by 75%. Using this position during the quiet times 

will save electricity, and keep the toaster warm.   

When needed, turn the switch to 

FULL POWER.

 Recovery time is a few minutes.

  

CAUTION

 CERTAIN SURFACES ARE EXTREMELY HOT DURING OPERATION AND CARE SHOULD 

BE TAKEN WHILE USING THIS UNIT.

COOKING PROCEDURES

BAGEL TOASTING

 Some toasters are equipped with a swinging heat shutter at the toaster entrance. This shutter 

will move out of the way as the product passes under it.

1) Turn the power saver to FULL POWER.
2) Set the conveyor speed to 50.
3) Allow warm up time of 20 to 30 minutes.
4) Place a sample product on the conveyor belt to test the settings.

 •If toasting is too light, turn conveyor speed control counterclockwise to a slower speed.
 •If toasting is too dark, turn heat control to a lower heat.

 (NOTE: Some products may require adjustment of the top and bottom heat controls in 

order to achieve the desired results)

Summary of Contents for QCS-2-1200B

Page 1: ...CONVEYOR TOASTER MODEL QCS 2 1200B RCS 2 1200B QCS 3 1600B Installation and Operation Instructions 2M HG0656 Rev I 2 11 2011 QCS 2...

Page 2: ...ions in information provided or conclusions reached as a result of using the specifications By using the information provided the user assumes all risks in connection with such use MAINTENANCE AND REP...

Page 3: ...nd those from inside the cooking chamber If damage is discovered file a claim immediately with the carrier that handled the shipment Do not operate the unit if it was damaged during shipping ASSEMBLY...

Page 4: ...ectricity and keep the toaster warm When needed turn the switch to FULL POWER Recovery time is a few minutes CAUTION CERTAIN SURFACES ARE EXTREMELY HOT DURING OPERATION AND CARE SHOULD BE TAKEN WHILE...

Page 5: ...LEANING Preventive maintenance for your Holman toaster consists of the following recommended cleaning procedures To keep your toaster in its top operating condition these steps should be performed on...

Page 6: ...re and back panel 3 Remove sprocket from motor shaft using an Allen wrench and loosening the set screw 4 Remove the wire from terminal block connecting the drive motor to internal wiring On units rate...

Page 7: ...sk at 1 800 807 9054 as the drive motor and or speed control may need replacing 8 Replace the enclosure by sliding it forward towards the front of the unit The front edge of the enclosure will slide b...

Page 8: ...c utensils or abrasive cleaners This warranty does not apply to the non stick properties of such materials This warranty does not apply to Special Products but to regular catalog items only Star s war...

Page 9: ...D ORG BLK BRN BRN NOTE DRIVE MOTOR FOR 240V USE BLACK AND BLUE WIRES FOR 208V USE BLACK WHITE WIRES BRN BRN BRN BLK RED BLK BLK BLK BRN BRN MAJ MODEL QCS 2 1200B QCS3 95HNH QCS 3 1600B THIS DRAWING CO...

Page 10: ...G BLU NOTE DRIVE MOTOR FOR 240V USE BLACK AND BLUE WIRES FOR 208V USE BLACK WHITE WIRES WIRE DIAGRAM 208 220 240 VOLT SIRED SERIES 065021 01 31 05 WIRING DIAGRAM RCS 2 1200B SERPENTINE THIS DRAWING CO...

Page 11: ...0 21 23 24 25 26 30 31 32 33 34 35 36 37 39 38 22 29 40 41 17 MODEL QCS RCS 2 1200B 1600B CONVEYOR TOASTER THIS DRAWING CONTAINS INFORMATION CONFIDENTIAL TO STAR MFG INT L INC NO REPRODUCTION OR DISCL...

Page 12: ...202904 1 SHAFT IDLER 21 SP 160027 1 BELT CONVEYOR 10 X 35 1 2 2B 200601 1 LINK CONVEYOR BELT 23 HA 100560 1 TRAY PULL OUT 24 HC 402457 1 CRUMB TRAY 25 2R 200787 1 CRUMB TRAY GUARD Crumb Tray Mounting...

Page 13: ...SP 160028 1 BELT CONVEYOR 14 X 35 1 2 2B 200602 1 LINK CONVEYOR BELT 14 22 2B 200603 3 LINK MASTER CONVEYOR BELT 23 HA 100561 1 TRAY PULL OUT QCS3 24 HH 402465 1 CRUMB TRAY QCS 3 25 2R 200788 1 CRUMB...

Page 14: ...00700 2 BEARING FRONT TEFLON 20 2A 202904 1 SHAFT IDLER 21 SP 160027 1 BELT CONVEYOR 10 x 35 1 2 2B 200601 1 LINK CONVEYOR BELT 23 HA 100560 1 TRAY PULL OUT 24 HC 402457 1 CRUMB TRAY 25 2R 200787 1 CR...

Page 15: ...209114 2 37 HEATER TUBE METAL BOTTOM 208V 2N 209198 2 38 HEATER TUBE METAL TOP 220V 2N 209113 2 37 HEATER TUBE METAL BOTTOM 220V 2N 209192 2 38 HEATER TUBE METAL TOP 240V 2N 209112 2 37 HEATER TUBE ME...

Reviews: