B U L L E T I N # 1 1 9 4 G L V - 4 0 D 1 G E A R L E S S T R A C T I O N M A C H I N E
Page 7-5
Rev. A - 04/01/2022
Encoder Installation
What’s in the box. See Figure 24.
Figure 24
1. Loosen and remove the bolt M2.5 and nut assembly in the new encoder. See Figure 25.
Figure 25
2. There is a taper in the front of the encoder shaft, put the encoder shaft into the hole of
the shaft. Figure 26.
Figure 26
HOLE OF
THE SHAFT
ENCODER
SHAFT