Service manual
7.8 Evacuation
Procedure:
Connect the vacuum pump to the charge set’s centre hose.
Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge needle does
not move (approximately 5 minutes after turning off the vacuum pump).
Disconnect the charge hose from the vacuum pump.
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
16
Summary of Contents for HKEI-HCNI 263 G
Page 1: ...Cover HKEI HCNI 263 G HKEI HCNI 353 G HKEI HCNI 503 G HOKKAIDO SERVICE MANUAL ...
Page 10: ...Service manual 4 Refrigerant cycle diagram Cooling only Heat pump mode 7 ...
Page 12: ...Service manual 6 Wiring diagram HKEI HCNI 263 353 503 G Indoor Outdoor 9 ...
Page 13: ...Service manual 10 ...