Safety Information
HK 43/6 S
Hohner Maschinenbau GmbH
8
1.10 Parts of the equipment which are particularly dangerous
There is a risk of injury in the area of moving parts of the stitching head.
1.11 Maintenance and repair work, elimination of faults
Undertake the required setting, servicing and inspection work on schedule.
The machine may only be operated in cycle mode during all servicing, inspection and repair work
on the Stitching Head 43/6 S.
Always make absolutely sure that the machine is only being operated by one person in order
to avoid any influence to the machine by any other persons.
1.12 Structural modifications to the stitching head
Changes to the stitching head, additions or modifications may only be undertaken with the
manufacturer's permission.
1.13 Cleaning the machine and the disposal of waste products
The functionality of the stitching head and perfect processing of the product can only be
guaranteed over a prolonged period of time if the stitching head is regularly cleaned and
maintained in accordance with the standard methods of mechanical engineering.
In this regard, particular attention should be paid to the regular removal of trimmed paper
residue and paper dust, as these can result in jamming of the stitching head or increased
wear.
Substances and materials used (e.g. solvents and lubricants) must be handled correctly and
disposed of in an environmentally friendly manner.
Summary of Contents for UNIVERSAL 43/6 S
Page 2: ...HK 43 6 S Hohner Maschinenbau GmbH 2...
Page 9: ...Safety Information Hohner Maschinenbau GmbH HK 43 6 S 9...
Page 14: ...Description of the Stitching Head HK 43 6 S Hohner Maschinenbau GmbH 14 Fig 2 Stroke...
Page 18: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 18 Fig 6 a b d c...
Page 20: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 20 Fig 7 b a...
Page 22: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 22 Fig 8a Fig 8b Fig 8c b a d c...
Page 24: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 24 Fig 9 Fig 10 a b c e g f i j d h...
Page 26: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 26 Fig 11 c a b...
Page 28: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 28 Fig 12 a b...
Page 30: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 30 Fig 13 e b a c d...
Page 40: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 40 4 Servicing Fig 22...
Page 44: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 44 Fig 25 a c b...
Page 50: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 50 Fig 36 Fig 37 Fig 38 b c a a b d e c f g h...
Page 52: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 52 Fig 39 a b c d...