Operation
Hohner Maschinenbau GmbH
HK 43/6 S
17
3.1 Installation of the stitching head
3.1.1 Clamping the stitching head
- Fig. 4 -
The stitching head is held by a tenon block which is inserted into the stitching head mounting on
the machine.
- Unscrew tenon block from the stitching head with Allen key SW4
e
.
- Introduce tenon block laterally into the stitching head mounting
b
.
- Insert stitching head into stitching head mounting, so that the driver lug
c
can be inserted into
the stroke bar
d
and the tenon block fits into the stitching head.
- Fix the stitching head by tightening the tenon block in the stitching head mounting using the Allen
key
e
.
3.1.1.1 Lateral adjustment of the stitching head
- Fig. 4, Fig. 5 -
The center of the wire formed parts within the stitching head must be set to the desired stitching
position for the wire stitch by lateral adjustment.
- Loosen the tenon block
a
with the Allen key
e
.
- Move the stitching head sideways, until the desired position is reached.
- Fix the tenon block in the stitching head mounting
b
with the Allen key.
3.1.1.2 Front adjustment of the stitching head
- Fig. 5 -
The lifting movement of the wire formed parts must drive the stitch accurately into the clincher box
forming gap. (Cf. Chap. 3.1.4). If the center of the wire stitch is located too far in front of or behind
the clincher box, or if the lifting movement is not precisely aligned with the clincher box, this can be
corrected by adjusting the set screws
f
on the stitching head.
- Remove stitching head.
- Adjust set screws
f
.
- Fit stitching head.
Summary of Contents for UNIVERSAL 43/6 S
Page 2: ...HK 43 6 S Hohner Maschinenbau GmbH 2...
Page 9: ...Safety Information Hohner Maschinenbau GmbH HK 43 6 S 9...
Page 14: ...Description of the Stitching Head HK 43 6 S Hohner Maschinenbau GmbH 14 Fig 2 Stroke...
Page 18: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 18 Fig 6 a b d c...
Page 20: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 20 Fig 7 b a...
Page 22: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 22 Fig 8a Fig 8b Fig 8c b a d c...
Page 24: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 24 Fig 9 Fig 10 a b c e g f i j d h...
Page 26: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 26 Fig 11 c a b...
Page 28: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 28 Fig 12 a b...
Page 30: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 30 Fig 13 e b a c d...
Page 40: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 40 4 Servicing Fig 22...
Page 44: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 44 Fig 25 a c b...
Page 50: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 50 Fig 36 Fig 37 Fig 38 b c a a b d e c f g h...
Page 52: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 52 Fig 39 a b c d...