![Hohner UNIVERSAL 43/6 S Operating Instructions Manual Download Page 41](http://html.mh-extra.com/html/hohner/universal-43-6-s/universal-43-6-s_operating-instructions-manual_2144676041.webp)
Servicing
Hohner Maschinenbau GmbH
HK 43/6 S
41
4.1 Lubrication
- Fig. 22 -
After approx. 16 operating hours, the stitching head must be lubricated with the lubricants
described below.
The felt disks of the wire feed spring must also be lightly lubricated from each day.
If the stitching head is not regularly lubricated, greater wear will occur, the service life of the
stitching head will be considerably decreased and premature failure of the stitching head may
occur.
4.1.1 Lubricants
Lubricating grease for guideways and friction points:
High temperature high performance grease
Recommendation: ELKALUB GLS 163 (250 gr.) – Order No. 96 90 021
Oil for felt disks:
Guideway oil with viscosity class 65-70 (ISO- viscosity class in accordance with DIN 51 519).
4.1.2 Lubrication plan
Date
Operating hours
status - display on
stitching unit
Oil or grease used
Performed by:
Name
Signature
Summary of Contents for UNIVERSAL 43/6 S
Page 2: ...HK 43 6 S Hohner Maschinenbau GmbH 2...
Page 9: ...Safety Information Hohner Maschinenbau GmbH HK 43 6 S 9...
Page 14: ...Description of the Stitching Head HK 43 6 S Hohner Maschinenbau GmbH 14 Fig 2 Stroke...
Page 18: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 18 Fig 6 a b d c...
Page 20: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 20 Fig 7 b a...
Page 22: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 22 Fig 8a Fig 8b Fig 8c b a d c...
Page 24: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 24 Fig 9 Fig 10 a b c e g f i j d h...
Page 26: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 26 Fig 11 c a b...
Page 28: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 28 Fig 12 a b...
Page 30: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 30 Fig 13 e b a c d...
Page 40: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 40 4 Servicing Fig 22...
Page 44: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 44 Fig 25 a c b...
Page 50: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 50 Fig 36 Fig 37 Fig 38 b c a a b d e c f g h...
Page 52: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 52 Fig 39 a b c d...