Safety Information
M 45/6
Hohner Maschinenbau GmbH
6
1
Safety Information
1.1 Purpose of this document
This document will inform the operator of the
Stitching Head M 45/6
of the following:
•
The safety symbols and signs
•
The packing of the machine and its transportation
•
The function and operation of the machine
•
Commissioning the machine
•
The elimination of faults which arise
•
Servicing
Familiarity with this Operating Manual is thus a prerequisite for the safe and correct operation of
the stitching head. It must be read carefully by the operator before the machine is commissioned.
Keep the manual safely in a place where it is readily available and which is close to hand for
persons working on the machine.
1.2 The
operator
The
Stitching Head M 45/6
must only be operated by trained personnel.
Training will be undertaken by the manufacturer or by persons who have been authorised by the
manufacturer to undertake such training.
1.3 Safety symbols and the displays that have been used
This symbol indicates immediate danger to the life or health of
persons in the immediate vicinity of the machine.
Non-observance of dangers which are so indicated can have grave
consequences and can cause serious damage to health, or may even to
lead to deaths.
This symbol indicates that a potentially dangerous situation has
arisen.
Non-observance of dangers which are so indicated can lead to slight injuries
to persons or damage to equipment.
This symbol indicates that tips on how to use the machine or
particularly useful information are available.
These will help you to use all of the functions of the machine in an optimal
manner.
-
This symbol requires you to take action.
•
This sign serves as a symbol for listing items.
Summary of Contents for M 45/6
Page 2: ...M 45 6 Hohner Maschinenbau GmbH 2...
Page 12: ...Description of the Stitching Head M 45 6 Hohner Maschinenbau GmbH 12 Fig 2...
Page 14: ...Operation M 45 6 Hohner Maschinenbau GmbH 14 3 Operation Fig 4...
Page 16: ...Operation M 45 6 Hohner Maschinenbau GmbH 16 Fig 5...
Page 18: ...Operation M 45 6 Hohner Maschinenbau GmbH 18 Fig 6...
Page 20: ...Operation M 45 6 Hohner Maschinenbau GmbH 20 Fig 7 Fig 8...
Page 22: ...Operation M 45 6 Hohner Maschinenbau GmbH 22 Fig 9...
Page 24: ...Operation M 45 6 Hohner Maschinenbau GmbH 24 Fig 10...
Page 26: ...Operation M 45 6 Hohner Maschinenbau GmbH 26 Fig 11...
Page 28: ...Operation M 45 6 Hohner Maschinenbau GmbH 28 Fig 12...
Page 30: ...Operation M 45 6 Hohner Maschinenbau GmbH 30 Fig 13 Fig 14 A B A...
Page 32: ...Operation M 45 6 Hohner Maschinenbau GmbH 32 correct incorrect incorrect Fig 15 Fig 16 Fig 17...
Page 34: ...Servicing M 45 6 Hohner Maschinenbau GmbH 34 4 Servicing Fig 18...
Page 38: ...Servicing M 45 6 Hohner Maschinenbau GmbH 38 Fig 21 Fig 22 A...
Page 40: ...Servicing M 45 6 Hohner Maschinenbau GmbH 40 A B Fig 24 Fig 23 Fig 25 Fig 26 Fig 27...
Page 42: ...Servicing M 45 6 Hohner Maschinenbau GmbH 42 Fig 28...