Operation
Hohner Maschinenbau GmbH
M 45/6
33
3.8 Spine centering parts
The centering parts are only used for saddle stitching. They serve to precisely position the staple
in the fold centre of the sheets
(- cf. 15 -)
3.8.1 Installing the holding down device (standard version)
- Fig. 17 -
- In order to install the holding down device
, insert the guide pin into the borehole on the bender
and tighten the fastening screw
.
3.8.2 Adjusting the holding down device (standard version)
- Fig. 17 -
The centering prism
can be moved back and forth by turning the adjusting screw
.
- Move the centering prism
backward or forward until it is precisely aligned with the prism of the
slider
.
- Adjust the height of the prism
(approx. 0.5 mm above the clincher box) by moving it in the slot
and tighten the fastening screw
.
3.8.3 Installing the holding down device (optional narrow version)
- Fig. 16 -
- In order to mount the holding down device, screw the spring bolt
into the borehole on the
stitching head.
- Insert extension spring into spring bolt
and lifting rod
.
- Fix holding down device by screwing fastening screw
to lifting rod
and flange bushings
on the stitching head.
- Make sure that the lifting rod moves smoothly.
- Installing the carrier
in the main slide bar - see SPARE PARTS LIST page E27.
3.8.4 Adjusting the holding down device (optional narrow version)
- Fig. 16 -
The centering prism
can be moved back and forth by turning the adjusting screw
.
- Move the centering prism
backward or forward until it is precisely aligned with the prism of the
slider
.
- Adjust the height of the prism
(approx. 0.5 mm above the clincher box) by moving it in the slot
and tighten the fastening screws
.
Summary of Contents for M 45/6
Page 2: ...M 45 6 Hohner Maschinenbau GmbH 2...
Page 12: ...Description of the Stitching Head M 45 6 Hohner Maschinenbau GmbH 12 Fig 2...
Page 14: ...Operation M 45 6 Hohner Maschinenbau GmbH 14 3 Operation Fig 4...
Page 16: ...Operation M 45 6 Hohner Maschinenbau GmbH 16 Fig 5...
Page 18: ...Operation M 45 6 Hohner Maschinenbau GmbH 18 Fig 6...
Page 20: ...Operation M 45 6 Hohner Maschinenbau GmbH 20 Fig 7 Fig 8...
Page 22: ...Operation M 45 6 Hohner Maschinenbau GmbH 22 Fig 9...
Page 24: ...Operation M 45 6 Hohner Maschinenbau GmbH 24 Fig 10...
Page 26: ...Operation M 45 6 Hohner Maschinenbau GmbH 26 Fig 11...
Page 28: ...Operation M 45 6 Hohner Maschinenbau GmbH 28 Fig 12...
Page 30: ...Operation M 45 6 Hohner Maschinenbau GmbH 30 Fig 13 Fig 14 A B A...
Page 32: ...Operation M 45 6 Hohner Maschinenbau GmbH 32 correct incorrect incorrect Fig 15 Fig 16 Fig 17...
Page 34: ...Servicing M 45 6 Hohner Maschinenbau GmbH 34 4 Servicing Fig 18...
Page 38: ...Servicing M 45 6 Hohner Maschinenbau GmbH 38 Fig 21 Fig 22 A...
Page 40: ...Servicing M 45 6 Hohner Maschinenbau GmbH 40 A B Fig 24 Fig 23 Fig 25 Fig 26 Fig 27...
Page 42: ...Servicing M 45 6 Hohner Maschinenbau GmbH 42 Fig 28...