Faults
Hohner Maschinenbau GmbH
M 45/6
45
Stitch legs break
off:
Hump at a stitch
corner:
Stitch legs
contract or
diverge:
Leg ends clinched
the wrong way
round:
One or both legs
are clinched
obliquely:
Stitch legs are
clinched obliquely
to the same side:
Lightly bent wire
pieces fall out:
Wire loop between
conveyor wheels
and wire guidance
tube:
Straight wire
pieces fall out:
- Wire too brittle: use a different wire quality.
- Former blocked by pieces of wire: remove wire
pieces, remove former if necessary.
- Gripper spring or gripper in former defective.
- Wire thickness not suitable for the wire guiding
parts (bender and driver).
- Adjust former to bender groove.
- Weak or soft wire.
- Driver damaged, cf. 4.2.2.
- Circular or flat knife worn, cf. 4.2.4.
- Wire not aligned, cf. 3.5.
- Circular or flat knife worn, cf. 4.2.4.
- Wire not aligned, cf. 3.5.
- Align clincher box, cf. 3.1.4.
- Weak or soft wire.
- Wire not aligned, cf. 3.5.
- Circular or flat knife worn, cf. 4.2.4.
- Clincher damaged, cf. 3.1.3.
- Adjustment of clincher box mounting to stitching
head mounting, cf. 3.1.4.
- Wire not aligned, cf. 3.5.
- Adjustment of clincher box mounting to stitching
head mounting, cf. 3.1.4.
- Wire not aligned, cf. 3.5.
- Bender worn, cf. 4.2.3.
- Wire not aligned, cf. 3.5.
- Cutting slider jammed: circular knife set too
tightly to flat knife, cf. 4.2.4.3.
- Cutting rocker locked, pressure spring in cutting
block defective.
- Lower wire tube in cutting block has shifted:
adjust slightly up or down.
- Former incorrectly set, cf. 4.2.1.
- Weak spring pressure on former.
- Wire not aligned, cf. 3.5.
- Former set incorrectly, cf. 4.2.1.
Summary of Contents for M 45/6
Page 2: ...M 45 6 Hohner Maschinenbau GmbH 2...
Page 12: ...Description of the Stitching Head M 45 6 Hohner Maschinenbau GmbH 12 Fig 2...
Page 14: ...Operation M 45 6 Hohner Maschinenbau GmbH 14 3 Operation Fig 4...
Page 16: ...Operation M 45 6 Hohner Maschinenbau GmbH 16 Fig 5...
Page 18: ...Operation M 45 6 Hohner Maschinenbau GmbH 18 Fig 6...
Page 20: ...Operation M 45 6 Hohner Maschinenbau GmbH 20 Fig 7 Fig 8...
Page 22: ...Operation M 45 6 Hohner Maschinenbau GmbH 22 Fig 9...
Page 24: ...Operation M 45 6 Hohner Maschinenbau GmbH 24 Fig 10...
Page 26: ...Operation M 45 6 Hohner Maschinenbau GmbH 26 Fig 11...
Page 28: ...Operation M 45 6 Hohner Maschinenbau GmbH 28 Fig 12...
Page 30: ...Operation M 45 6 Hohner Maschinenbau GmbH 30 Fig 13 Fig 14 A B A...
Page 32: ...Operation M 45 6 Hohner Maschinenbau GmbH 32 correct incorrect incorrect Fig 15 Fig 16 Fig 17...
Page 34: ...Servicing M 45 6 Hohner Maschinenbau GmbH 34 4 Servicing Fig 18...
Page 38: ...Servicing M 45 6 Hohner Maschinenbau GmbH 38 Fig 21 Fig 22 A...
Page 40: ...Servicing M 45 6 Hohner Maschinenbau GmbH 40 A B Fig 24 Fig 23 Fig 25 Fig 26 Fig 27...
Page 42: ...Servicing M 45 6 Hohner Maschinenbau GmbH 42 Fig 28...