![Hoffmann Megaplan Megaspin Use And Maintenance Manual Download Page 8](http://html1.mh-extra.com/html/hoffmann/megaplan-megaspin/megaplan-megaspin_use-and-maintenance-manual_2144175008.webp)
4
2
3
1
8
Ver. 0
4
-2015
ENGLISH
Use and Maintenance Manual
2. INSTALLATION
1. Unpack the machine and place the front guard
on the ground with the spindle locking/release
pedal, the Zero Weight lift and the side guard (1).
3. Do not install the machine in an area directly
exposed to sunlight or where there are reflections
from the floor. The machine might malfunction
if there is excess light (3).
2. Absolutely do not force the side column when
unloading the machine from the pallet and be
careful with the electrical wiring (2).
Installation
4. Avoid positioning objects made of a particularly
reflecting material in the areas indicated in gray,
as they might interfere with laser reading (4).