INSTALLATION MANUAL
ZANZIBAR
17
hofflights.com
IMH-099 v.01
When hanging the Fan REMEMBER to turn off the power. Follow the steps below to hang your fan properly:
5
Align the holes at the bottom of the downrod with the holes in the coupling on top of the top housing
6
Carefully insert the Bolt through the holes in the Coupling and downrod. Be careful not to jam the Bolt against the
wiring inside the downrod. Insert the locking pin through the hole near the end of the Bolt until it snaps into its locked
position
7
Insert the support pin in the holes at the top of the downrod. Make sure the support pin is properly seated in the
grooves in the top of the hanger ball
8
Tighten the set crews firmly
9
Tighten two set screws on top of the fan housing firmly
INSTALL THE DOWNROD
3
Your fan comes with two optional downrods 4” and
10” (10cm and 25cm)Choose one downrod which is
suitable for your ceiling and slide the hanger ball
up the downrod
4
Route wires exiting from the top of the fan motor
through thecoupling cover, canopy and then through
the downrod and the hanger ball.
1
Flip the motor assembly with blades over.
2
Remove the bolt,
lock pin and set screws
from the downrod