SECTION 3. OPERATION
1-3
1
1.General
1-3
1
2. Operating the Generator Set
1-3
1
A. Pre-start Inspection
1-3
1
B. Normal Engine Starting Procedures
1-3
1
C. Cold Weather Engine Starting Procedures
1-3
4
D. Preparation for Power Delivery
(Normal Automatic Voltage Control)
1-3
5
E. Power Delivery
1-3
5
No. 1 Output Circuit
1-3
5
No. 2 Output Circuit
1-3
6
F. Discontinue Power Delivery
1-3
6
K. Stopping the Engine
1-3
6
3. Transformer-Rectifier Operation
1-3
6
A. Direct Current Power Delivery
1-3
6
B. Simultaneous 28.5-V DC and
115-V AC Power Delivery
1-3
7
4. Trailer Operation (Optional)
1-3
8
A. Towing
1-3
8
B. Parking
1-3
8
CHAPTER 2. SERVICE
SECTION 1. MAINTENANCE
2-1
1
1. General
2-1
1
2. Inspection
2-1
1
3. Lubrication
2-1
1
A. General
2-1
1
B. Generator
2-1
1
C. Generator Controls
2-1
1
D. Engine
2-1
1
(1) Lubrication schedule
2-1
2
(2) Oil specification
2-1
2
(3) Oil viscosity
2-1
2
(4) Changing engine oil
2-1
2
(5) Changing engine oil filter
2-1
2
E. Starter
2-1
2
4. Air Cleaner Service
2-1
3
A. Cartridge Removal (See Fig. 2)
2-1
3
B. Cartridge Installation (See Fig. 2)
2-1
4
5. Engine Fuel
2-1
4
A. Quality
2-1
4
B. Fuel Filter
2-1
4
SUBJECT
CHAPTER/SECTION
PAGE
OM-2029
September 30/89 Revised
Table of Contents
Page 3
Summary of Contents for 140GT17K
Page 2: ...This page intentionally left blank ...
Page 16: ...This page intentionally left blank OM 2029 Addendum June 6 90 Page 4 ...
Page 17: ......
Page 18: ......
Page 42: ...Output Terminal Panel Figure 11 OM 2029 1 1 September 30 89 Revised Page 24 ...
Page 46: ...This page intentionally left blank OM 2029 1 2 September 30 89 Revised Page 4 ...
Page 74: ...This page intentionally left blank OM 2029 2 2 September 30 89 Revised Page 6 ...
Page 122: ...Generator Set Figure 1 OM 2029 4 3 September 30 89 Revised Page 2 ...
Page 126: ...This page intentionally left blank 4 3 July 27 90 Page 3C OM 2029 ...
Page 128: ...Canopy Assembly Figure 2 OM 2029 4 3 September 30 89 Revised Page 4 ...
Page 130: ...Generator Set Without Canopy Figure 3 OM 2029 4 3 September 30 89 Revised Page 6 ...
Page 132: ...This page intentionally left blank OM 2029 4 3 September 30 89 Revised Page 8 ...
Page 134: ...Radiator and Cooling System Group Figure 4 OM 2029 4 3 September 30 89 Revised Page 10 ...
Page 136: ...Air Cleaner Assembly Figure 5 OM 2029 4 3 September 30 89 Revised Page 12 ...
Page 138: ...Electric Governor Kit Figure 6 OM 2029 4 3 September 30 89 Revised Page 14 ...
Page 140: ...Panel Engine Control Assembly Figure 7 OM 2029 4 3 September 30 89 Revised Page 16 ...
Page 142: ...Generator Control Box Assembly Figure 8 4 3 July 27 90 Page 18 OM 2029 ...
Page 144: ...This page intentionally left blank OM 2029 4 3 September 30 89 Revised Page 20 ...
Page 146: ...Stator Terminal Panel Assembly Figure 9 OM 2029 4 3 September 30 89 Revised Page 22 ...
Page 148: ...Power Module Panel Assembly Figure 10 OM 2029 4 3 September 30 89 Revised Page 24 ...
Page 150: ...Generator Group Figure 11 OM 2029 4 3 September 30 89 Revised Page 26 ...
Page 152: ...Fuel Line Assembly Figure 12 OM 2029 4 3 September 30 89 Revised Page 28 ...
Page 156: ...This page intentionally left blank 4 3 March 16 90 Page 32 OM 2029 ...
Page 158: ...This page intentionally left blank 4 3 March 16 90 Page 34 OM 2029 ...
Page 160: ...Brake Kit Assembly Figure 14 4 3 March 16 90 Page OM 2029 ...
Page 162: ...This page intentionally left blank 4 3 March 16 90 Page 38 OM 2029 ...
Page 168: ...This page intentionally left blank 4 3 July 27 90 Page 44 OM 2029 ...
Page 178: ...This page intentionally left blank OM 2029 4 4 September 30 89 Revised Page 10 ...
Page 180: ...This page intentionally left blank OM 2029 5 0 September 30 89 Revised Page 2 ...
Page 182: ...This page intentionally left blank OM 2029 6 0 September 30 89 Revised Page 2 ...
Page 184: ...This page intentionally left blank OM 2029 Unusual Service Conditions September 30 89 Page 2 ...
Page 185: ......
Page 186: ......