
19
Step 7
a. Insert the Plug
φ25 (#51) into parts (#24, #25). Set the part (#24) through the part (#3). Set the part (#25) through the part (#13).
Set the Foam (#52) onto them.
b. Attach the part (#14) to the part (#8) using (4) Hex Bolts M6*20 (#74) and (4) Big Washer 6 (#75).
c. Insert the part (#8) into the part (#13) and attach it using the Pin (#43).
CABLE DIAGRAMS
After the Machine is assembled, check whether the cable is tensioned. (At correct tension, there should be a gap of 3-5mm
between the Top Plate and the Weight Stack).
If the Cable is slightly loose, adjust it by tightening the Bolt at the top of the weight stack.
If the Cable is very loose, adjust the length of Coil Chain (#55), using the Snap Link (#57).