DAILY
MAINTENANCE
CHECK-LIST
6 Daily maintenance Check list
6.1 Check list
This check list is the summary of the operations to do on a daily base to maintain the
HLF 1700 in a perfect state ready to be used:
9
Automatic Daily Cleaning. (Ref. chapter 4)
9
Additional Daily Cleaning (manual). (Ref. chapter 4)
9
Beans hopper/s filled with coffee beans
9
Instant powder container filled (only if Soluble is installed)
9
Outside cleaned and dusted
HLF Italian Design
58
I.M. HLF 1700 Eng V1-2017