10. Service
Works related to commissioning, annual inspection and repairs shall be delivered by HKS LAZAR
authorized service only.
10.1 Check before commissioning
User shall report to the boiler manufacturer readiness for commissioning within 7 days since
completion of works. Commissioning (the first run) shall be performed by HKS LAZAR authorized
service only. The guarantee shall only be valid, if any work in terms of commissioning were
delivered by HKS LAZAR authorized service. User shall cover the costs of commissioning
pursuant to HKS LAZAR pricelist. Detail data of HKS LAZAR Sp. z o.o. required for reporting
readiness for commissioning is available on website, namely:
.
If upon arrival on site authorized service does not perform commissioning due to reasons being
beyond its control (installation delivered in poor manner, wrong boiler position, absence of fuel,
power supply failure, etc.) the user shall be charged with costs of this commissioning and the next
ones. In such case the user shall within 14 days report to the manufacturer readiness for
commissioning.