1. INSTALLATION OF MEASURING TAPE ON ELBOWS 

INSTALLATION

* INSTALLATION PROCESS (RECOMMENDED)

     (After installation of Guide Pipe, Float and Bottom Anchor to inside the tank),
     1. Pass the measuring tape through the 90

o

 sheave elbows.

     2. Install the measuring tape after disassembly of the gauge head. 
     3. Install the spring motor to spring loaded drum (1) and (2) in the gauge head. 
     4. Connect the weight.     

 

Before installation of measuring tape 
on  elbows,  install  the  seal  pipes  as 
shown in [Fig.1] in advance. But, install 
the seal pipe on nozzle (tank) side after 
installation  of  measuring  tape  and 
weight.  

Unfasten the bolts on covers of Elbow-A 
and Elbow-B and open covers.

* CONDITION FOR THE INSTALLATION AND ADJUSTMENT

     1. Seal pipe and bottom anchor should be prepared by user. 
     2. Installation of elbow and seal pipe in advance is fine. However, install the 
         seal pipe on nozzle side to the elbow after installation of measuring tape and  
         weight (Refer to page 8 and 11). 
     3. Inside the tank should be empty and there should be nothing which can 
         disturb the installation of the level gauge.  
     4. Tank nozzle should be installed in advance, suitable with our connection 
        part and it should not be dangerous for work inside the tank.     
     5. There should be no leakage of the medium.
     6. The environment for performing of the installation and adjustment safely 
        should be prepared. 

Pass one end of measuring tape (not 
perforated)  from  Elbow-B  to  the 
direction of Elbow -A as shown in [Fig.2] 
and make sure that the measuring tape 
with hole (perforated) side should be 
positioned in a gauge head, not in a 
tank.

If seal pipe on nozzle side is already 
installed, pull out the measuring tape

 

through  elbow 
and  se al  pipe 
after unfastening 
of them for the 
installation of the 
weight. (Refer to 
left image)

Seal Pipe

Measuring T

ape

Summary of Contents for HLT-1112

Page 1: ...by HEAD OFFICE FACTORY R D INSTITUTE 141 Palhakgol Gil Jori Eup Paju Si Gyeonggi Do Korea Tel 82 31 950 9700 Fax 82 31 943 5600 Website www hitrol com INSTRUCTION MANUAL MAGNETIC COUPLING TYPE TANK L...

Page 2: ...llation Process 1 Installation of Measuring Tape on Elbows 2 Installation of Measuring Tape and Spring Motor Inside the Tank 3 Installation of Measuring Tape Weight Side 4 Reference for the Bottom Anc...

Page 3: ...tion and maintenance Option for remote indication control and switch for alarm Large scale dial enables legible indication even at a distant location The float in a tank floats on the surface of the l...

Page 4: ...g Indicator 2 Points Dial Ambient Temperature 20o C 60o C Fluid Temperature Max 150o C Operating Pressure Up to 5kg cm2 Enclosure Weather Proof IP65 Application Liquid Measuring Range 2 5M 5M Specific...

Page 5: ...ALWAYS THE BEST SOLUTION HITROL CO LTD SYSTEM COMPOSITION AND DETAILS OF PARTS HLT 1112 SCREW TYPE...

Page 6: ...ALWAYS THE BEST SOLUTION HITROL CO LTD HLT 1212 FLANGE TYPE...

Page 7: ...Std NPT 1 1 2 PF 1 1 2 and other Flange ANSI JIS and DIN Material 304SS 316LSS and other Connection Pipe User Scope Connection Socket Flange for Guide Pipe Nozzle Flange User Scope Guide Pipe Connect...

Page 8: ...bottom anchor should be prepared by user 2 Installation of elbow and seal pipe in advance is fine However install the seal pipe on nozzle side to the elbow after installation of measuring tape and we...

Page 9: ...unterclockwise to give a tension to the measuring tape The measuring tape without holes not perforated should not be positioned in the gauge head 2 INSTALLATION OF MEASURING TAPE AND SPRING MOTOR INSI...

Page 10: ...omplete the installation of spring motor after fixing by upper locking ring Fix all spring loaded drum 1 and 2 PRECAUTION When the spring motor gets out of the spring loaded drum larger or excessive f...

Page 11: ...ct the folded measuring tape to the weight as above The length of bolt should not be over 10mm because long bolt can cause a malfunction of the gauge 2 Put the weight connected with the measuring tape...

Page 12: ...clockwise about 90o 1 4 turn the float is slightly lifted DIRECTION FOR THE INSTALLATION 1 Use the galvanized or stainless steel pipe for outside tank 2 Non linearity due to flexure of pipe must be li...