3. INSTALLATION OF MEASURING TAPE (WEIGHT SIDE)

4. REFERENCE FOR THE BOTTOM ANCHOR INSTALLATION

1. Bottom Anchor is a user scope so it should be prepared by user. 
2. It is recommended to install the bottom anchor before installation of tank level 
    gauge in order to prevent a change of it's location. 
3. It is recommended to put the bottom anchor to the bottom of our guide pipe 
    first and adjust the upper position. After fixing of the upper position, fix the 
    bottom anchor to the tank bottom.  

1. Connect the folded measuring tape to the weight as above. The length of bolt  
    should not be over 10mm because long bolt can cause a malfunction of the 
    gauge. 
2. Put the weight connected with the measuring tape to inside the tank through 
    the seal pipe. 
3. After put of weight, check whether the measuring tape gets out of the roller 
    or not. If not, complete the installation of measuring tape after assembly of 
    elbow cover.   

   

3-1. Folding of Measuring Tape

Fold the measuring tape on Elbow-A as below order.

* PRECAUTION :
 

  • Temporarily fixing the measuring tape on upper elbow  

      suitable for each site condition.  
   • Take care not to bend or give damages to the measuring 
      tape when folding of it.

3-2. Connection of the measuring tape to the weight

Folding

 

Folding

 

1

2

3

4

Summary of Contents for HLT-1112

Page 1: ...by HEAD OFFICE FACTORY R D INSTITUTE 141 Palhakgol Gil Jori Eup Paju Si Gyeonggi Do Korea Tel 82 31 950 9700 Fax 82 31 943 5600 Website www hitrol com INSTRUCTION MANUAL MAGNETIC COUPLING TYPE TANK L...

Page 2: ...llation Process 1 Installation of Measuring Tape on Elbows 2 Installation of Measuring Tape and Spring Motor Inside the Tank 3 Installation of Measuring Tape Weight Side 4 Reference for the Bottom Anc...

Page 3: ...tion and maintenance Option for remote indication control and switch for alarm Large scale dial enables legible indication even at a distant location The float in a tank floats on the surface of the l...

Page 4: ...g Indicator 2 Points Dial Ambient Temperature 20o C 60o C Fluid Temperature Max 150o C Operating Pressure Up to 5kg cm2 Enclosure Weather Proof IP65 Application Liquid Measuring Range 2 5M 5M Specific...

Page 5: ...ALWAYS THE BEST SOLUTION HITROL CO LTD SYSTEM COMPOSITION AND DETAILS OF PARTS HLT 1112 SCREW TYPE...

Page 6: ...ALWAYS THE BEST SOLUTION HITROL CO LTD HLT 1212 FLANGE TYPE...

Page 7: ...Std NPT 1 1 2 PF 1 1 2 and other Flange ANSI JIS and DIN Material 304SS 316LSS and other Connection Pipe User Scope Connection Socket Flange for Guide Pipe Nozzle Flange User Scope Guide Pipe Connect...

Page 8: ...bottom anchor should be prepared by user 2 Installation of elbow and seal pipe in advance is fine However install the seal pipe on nozzle side to the elbow after installation of measuring tape and we...

Page 9: ...unterclockwise to give a tension to the measuring tape The measuring tape without holes not perforated should not be positioned in the gauge head 2 INSTALLATION OF MEASURING TAPE AND SPRING MOTOR INSI...

Page 10: ...omplete the installation of spring motor after fixing by upper locking ring Fix all spring loaded drum 1 and 2 PRECAUTION When the spring motor gets out of the spring loaded drum larger or excessive f...

Page 11: ...ct the folded measuring tape to the weight as above The length of bolt should not be over 10mm because long bolt can cause a malfunction of the gauge 2 Put the weight connected with the measuring tape...

Page 12: ...clockwise about 90o 1 4 turn the float is slightly lifted DIRECTION FOR THE INSTALLATION 1 Use the galvanized or stainless steel pipe for outside tank 2 Non linearity due to flexure of pipe must be li...

Reviews: