Miscellaneous—Operational Checkout
– – –1/3
Cycle Times Check
CAUTION: Make
sure area is clear
and large enough
to operate all
functions of
machine.
IMPORTANT: Warm
hydraulic oil to operating
temperature for this
check.
Engine at fast idle.
Auto-idle/auto-acceleration switch OFF.
Travel speed switch in fast position
Record cycle time for each function.
Zaxis 200LC Forester Live Heel Log Loader—Specification
Boom Raise (cylinder extend)—Cycle
Time (seconds)
5.5
±
0.3
....................................................................................................
Boom Lower (cylinder retract)—Cycle
Time (seconds)
4.3
±
0.3
....................................................................................................
Arm In (cylinder retract)—Cycle Time
(seconds)
2.5
±
0.3
.............................................................................................................
Arm Out (cylinder extend)—Cycle Time
(seconds)
5.5
±
0.3
.............................................................................................................
Heel Out (cylinder extend)—Cycle Time
(seconds)
3.4
±
0.3
.............................................................................................................
Heel In (cylinder retract)—Cycle Time
(seconds)
2.0
±
0.3
.............................................................................................................
Swing Left Or Right For 3 Revolutions
From A Running Start—Cycle Time
(seconds)
13.5
±
1.0
...........................................................................................................
Zaxis 200LC Forester Road Builder—Specification
Boom Raise (cylinder extend)—Cycle
Time (seconds)
2.9
±
0.3
....................................................................................................
Boom Lower (cylinder retract)—Cycle
Time (seconds)
2.4
±
0.3
....................................................................................................
Arm In (cylinder extend)—Cycle Time
(seconds)
3.6
±
0.3
.............................................................................................................
Arm Out (cylinder retract)—Cycle Time
(seconds)
2.6
±
0.3
.............................................................................................................
Bucket Load (cylinder extend)—Cycle
Time (seconds)
3.2
±
0.3
....................................................................................................
Bucket Dump (cylinder retract)—Cycle
Time (seconds)
2.1
±
0.3
....................................................................................................
Swing Left Or Right For 3 Revolutions
From A Running Start—Cycle Time
(seconds)
13.5
±
1.0
...........................................................................................................
Zaxis 200LC Forester Travel Speed—Specification
Forward And Reverse Fast Speed Travel
For 20 m (65 ft) From A Running Start—
Cycle Time (seconds)
13.0
±
0.6
.......................................................................................
Forward And Reverse Slow Speed
Travel For 20 m (65 ft) From A Running
Start—Cycle Time (seconds)
20.6
±
1.0
............................................................................
Zaxis 250 Forester Live Heel Log Loader—Specification
Boom Raise (cylinder extend)—Cycle
Time (seconds)
6.5
±
0.3
....................................................................................................
Boom Lower (cylinder retract)—Cycle
Time (seconds)
6.0
±
0.3
....................................................................................................
Arm In (cylinder retract)—Cycle Time
(seconds)
2.5
±
0.3
.............................................................................................................
Arm Out (cylinder extend)—Cycle Time
(seconds)
4.2
±
0.3
.............................................................................................................
Heel Out (cylinder extend)—Cycle Time
(seconds)
4.0
±
0.3
.............................................................................................................
Heel In (cylinder retract)—Cycle Time
(seconds)
2.5
±
0.3
.............................................................................................................
Swing Left Or Right For 3 Revolutions
From A Running Start—Cycle Time
(seconds)
16
±
1.0
..............................................................................................................
4-2-9
081407
PN=180