UNUnbalAlm>
=
2.5% UBase
•
UNUnbalWrn>
=
1.0% UBase
•
UMin>
=
75% UBase
2.
Activate the RESETCOMP input to ensure that the stored values of the compensation factors
are reset to zero.
3.
The logical signals and service values for SCUVPTOV function are available on the local HMI
under:
Main menu/Tests/Function status/Unbalance protection/
CapBankVoltageUnbalance(60V, Uub>)/SCUVPTOV(60V, Uub>):x
, where x = instance
number.
4.
To store the new values of compensation factors, perform the following steps:
Step No.
Changes after step 2
Expected Output
4-a
Inject constant voltages* of U
L1
=
63.5
∠
0° V, U
L2
= 63.5
∠
240° V,
U
L3
= 63.5
∠
120° V,
and U
N
= 0
∠
0° V in secondary at
rated frequency.
UL1, UL2, and UL3 = 230.909 kV
UNSCB = 0.000 kV
UNUNBAL = 0.000 kV
PUNUNBAL= 0.000 %
The following outputs should show the mentioned
values:
•
K1USED = 0.000
•
K2USED = 0.000
•
K1MON = 0.000
•
K2MON = 0.000
4-b
Change U
N
= 2
∠
0° V in
secondary at rated frequency
UL1, UL2, and UL3 = 230.909 kV
UNSCB = 7.273 kV
UNUNBAL = 7.273 kV
PUNUNBAL = 3.151 %
The following outputs should show the mentioned
values:
•
K1USED = 0.000
•
K2USED = 0.000
•
K1MON = 0.030
•
K2MON = 0.030
4-c
Activate binary input TRIGCOMP
for 1 s
UL1, UL2, and UL3 = 230.909 kV
UNSCB = 7.273 kV
UNUNBAL = 0.000 kV
PUNUNBAL= 0.000 %
•
The output COMPEXED should become
HIGH for 100 ms
•
The output LASTCOMP should display the
date and time of compensation.
The following outputs should show the mentioned
values:
•
K1USED = 0.030
•
K2USED = 0.030
•
K1MON = 0.030
•
K2MON = 0.030
* - VT ratios of phase voltages and neutral voltages are considered as 400 kV/110 V. The value of
UBase is considered as 110 V.
The voltage inputs U
L1
, U
L2
, and U
L3
refer to the bus voltages and U
N
refers to the neutral voltage
input.
5.
Check the respective operation of warning, alarm, and trip.
Section 11
1MRK 511 403-UEN Rev. L
Testing functionality by secondary injection
142
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...