![Hitachi LQE050 Hardware Manual Download Page 42](http://html.mh-extra.com/html/hitachi/lqe050/lqe050_hardware-manual_140503042.webp)
5 SETUP AND OPERATIONS
5-9
5.5 Stopping, Then Running CPU Module
Set the CPU module LADDER switch from STOP to RUN to start data transmission. The state of
transmission in progress can be verified by viewing the LINK LED light on the CPU link module’s
front-panel.
• For the location of the LADDER switch, see Section 5.3; for the location of the LINK LED, see
Chapter 3.
• RUN has two modes of operation: normal (NORM) and simulation (SIMU) (Use the CPU module
MODE switch to choose between these two modes). Either mode setting enables the CPU link
module to transmit.
The settings entered in Section 5.4 are loaded into the CPU link module when the LADDER switch
is set from STOP to RUN or when the CPU is reset. Whenever a new setting is made (or the
existing setting is changed), be sure to set the LADDER switch from STOP to RUN or reset the
CPU.
Summary of Contents for LQE050
Page 1: ......
Page 2: ......
Page 15: ...1 BEFORE USE ...
Page 20: ...2 SPECIFICATIONS ...
Page 23: ...3 NAMES AND FUNCTIONS OF EACH PART AND CABLING ...
Page 27: ...4 OPERATIONS ...
Page 34: ...5 SETUP AND OPERATIONS ...
Page 43: ...6 PROGRAM EXAMPLES ...
Page 45: ...7 TROUBLESHOOTING ...