![Hitachi CP-DX250 guide Service Manual Download Page 43](http://html.mh-extra.com/html/hitachi/cp-dx250-guide/cp-dx250-guide_service-manual_144064043.webp)
7.1.2 ILL HSG and DMD HSG Assembly:
7.1.2.1 To assemble "ILL HSG" (and its attachments) with
and then lock with screws (Fig. 7
Fig. 7-9
Overfill Vertical
Adjustment Screw
M2, 8L
DMD
Direction
ILL HSG
DMD HSG
42
Fig. 7-8
ILL HSG and DMD HSG Assembly:
To assemble "ILL HSG" (and its attachments) with "DMD HSG", cover over on "AL"
and then lock with screws (Fig. 7-9, 7-10)
Fig. 7-10
Overfill Horizontal
Adjustment Screw
M2, 8L
AL
Screw M2
"DMD HSG", cover over on "AL"
Overfill Horizontal
Adjustment Screw
M2, 8L
Fixed
shafts&
holes
Summary of Contents for CP-DX250 guide
Page 5: ...4 2 2 Electrical Specification 2 2 1 Timing Table ...
Page 6: ...5 ...
Page 7: ...6 ...
Page 11: ...10 3 Names of Each Part 3 1 Projector Exterior View See Control Panel on next page for detail ...
Page 12: ...11 3 2 Control Panel ...
Page 13: ...12 3 3 Remote Control ...
Page 26: ...25 5 Troubleshooting 5 1 Basic Trouble Shooting for End Customer ...
Page 56: ...55 8 Disassembly Diagram ...
Page 57: ...56 ...
Page 58: ...57 ...