-14-
5. Removal of the gear holder and the motor
(1) Pull out the Connecting Piece
[29]
and the Needle Bearing
[30]
from the Gear
[31]
.
(2) Remove the Retaining Ring for D7 Shaft
[28]
from the tip of the spindle.
(3) Remove the Gear
[31]
, Balance Weight
[32]
, Orbital Cam
[33]
and Washer (A)
[34]
in order.
(4) Pull out the Ball Bearing 608VVC2PS2L
[16]
and the Motor DC14.4 V
[17]
press-fitted in the Gear
Holder
[35]
.
6. Removal of the DC-speed control switch and the wiring of the motor
(1) Remove the Pushing Button
[3]
and the Switch Ass’y
[51]
(including the LED
[2]
, DC-Speed Control
Switch
[4]
and terminal) from the housing.
(2) Cut the lead wire (red) and the lead wire (black) wired from the LED
[2]
to the DC-Speed Control Switch
[4]
.
(3) Cut the lead wire (red) and the lead wire (black) wired from the Motor DC 14.4 V
[17]
to the DC-Speed
Control Switch
[4]
.
(4) Cut the lead wire (blue) and the lead wire (brown) wired from the DC-Speed Control Switch
[4]
to the
terminal.
• Removal of the gear holder and the motor
Retaining Ring
for D7 Shaft
[28]
Connecting
Piece
[29]
Needle Bearing
[30]
Gear
[31]
Gear Holder
[35]
Washer (A)
[34]
Ball Bearing
608VVC2PS2L
[16]
Orbital Cam
[33]
(Motor DC 14.4 V
[17]
)
Balance Weight
[32]
• Removal of the DC-speed control switch and the wiring of the motor
(Motor DC 14.4 V
[17]
)
LED
[2]
DC-Speed Control Switch
[4]
Pushing Button
[3]
Controller Terminal Set
[13]