Model: FVC68D (Ether Oil)
(4) Stop Valve
<Liquid Valve>
Stop Valve Core for Opening and closing
Gas Valve
Liquid Valve
5.5 Air Tight Test
when attaching work is difficult.
pipes with rubber sheath (Field-
Rear Piping Work
Liquid Piping
Bottom Side Piping Work
Liquid Piping
Power Wire
Gas Piping
Knock Out Hole
Bottom Base
Bottom Side Piping Hole
c
Rear Cover
To avoid damage protect cables and
Supplied).
Rubber Sheath(attatch part)
Cut a "+" shape gap at rubber sheath
center,wire lead rubber sheath.
Gas Pipe
Liquid Pipe
Power and Transmission Wire
Pipe Cover
insulation (Factory-Supplied) adequately
when installing the piping cover. Cut the
lower side guide line of the piping cover
To prevent gaps use a rubber bush and
Insulation Pipe
(1) The stop valve has been closed before
shipment, however, make sure that the stop
valves are closed completely.
(2) Connect the indoor unit and the outdoor
unit with field-supplied refrigerant piping.
Suspend the refrigerant piping at certain
points and prevent the refrigerant piping
from touching the weak part of the building
such as wall, ceiling, etc.
(If touched, abnormal sound may occur due
to the vibration of the piping. Pay special
attention in case of short piping length.)
(3) Apply the oil thinly at the seat surface of the
flare nut and pipe before tightening.
And when tightening the flare nut, use two
spanners.
Lubrication Oil is field-supply.
Manufacturer: IDEMITSU KOSAN Co., Ltd.
Completion
of Ref.
Piping
Repairing
of Leakage
Part
Check of
Pressure
Decrease
Applying
Nitrogen
Gas
Pass
Procedure
Fig.5.3 Stop Valve Position
Operation of the stop valve should be
performed according to the below.
Rear Piping Guide Hole
spindle valve
To open or close
Wrench(Size:4mm)
Hexagonal
(rubber)
O-Ring
Liquid Valve:37N m
Gas Valve:49N m
(Attach this after work)
torque below.
Tighten the cap with a
Liquid Valve:16N m Cap
torque below.
Tighten the cap with a
( )
can be connected
Only the charging hose
leakage will occur
at this posotion.If applied,
Do not apply two spanners
flare nut
here to squeeze
Use two spanners
Spindle Valve
Counterclockwise
Open
Close
Clockise
Close before shipment
Ref.Pressure
Refrigerant Piping
Liquid Stop Valve
. . ..
. . ..
Check Joint
.
.
.
Refrigerant Piping
( )