after finish charging.
Table 5.3 is Outdoor Unit Ref.charge before shipment
Inform local service the quantity of charging refrigerant
length,charge it to refrigerant cycle.
Calculate charge refrigerant quantity by liquid pipe
Outdoor Unit
it is required that additional refrigerant be charged
to piping length.
according
Although refrigerant has been charged into this unit,
(1) Ensure that the directions for refrigerant piping work according
(2) Additional Refrigerant Charge R410A
to the tables.
Gas Pipe
Indoor Unit Pipe Model
Table 5.2 Indoor Unit Pipe Model
Table 5.1 Limitation of Outdoor Unit
Outer Diameter of Pipe
Model
Gas Liquid
5.2
Refrigerant Piping Work
Diameter
Liquid Pipe
liquid length
liquid length
9
RPI-1.0~1.5FSNQL(H)
RPIZ-1.0~1.5FSN1Q
RCI-1.0~1.5FSN1Q
RCD-1.0~1.5FSN2Q
RPK-1.0~1.5FSNQ
RPF(I)-1.0~1.5FSNE
RPI-1.8~2.0FSNQL(H)
RPIZ-1.8~2.0FSN1Q
RCI-1.8~2.0FSN1Q
RCD-2.0FSN2Q,RPC-2.0FSN
RPK-2.0FSNQ~2.3FSNQ
RPI-2.3~3.0FSNQL(H)
RPIZ-2.3~2.5FSN1Q
RCI-2.3~3.0FSN1Q
RCD-2.5~3.0FSN2Q
RPC-2.5~3.0FSN
RPI-4.0~6.0FSNQL(H)
RCI-4.0~6.0FSN1Q
RCD-4.0~5.0FSN2Q
RPC-4.0~5.0FSN