
Installation Instructions
ML12E User Manual, 99151B, September 2021
13
3�
Cut a rectangular hole in the panel.
f
Cutout Dimensions (W x H) for the HIS-ML12:
307.8 mm x 262.9 mm (12.12" x 10.35"); ± 0.5 mm (0.020")
4� Clean and deburr the panel hole�
5�
Separate the rear collar from the monitor by removing the 8 nuts.
6�
Refer to the enclosure mounting diagram below.
7� Insert the unit into the front of the panel and re-attach the collar�
NOTE:
Contact Hope Industrial Systems if for any reason your application does
not allow for installation of the collar�
8�
Tighten all 8 nuts to a torque of 10-15 inch-pounds to ensure a watertight seal
between the bezel gasket on the monitor and the equipment panel. Go around all
nuts twice to ensure an even compression on gasket.
NOTE:
If a torque wrench is not available, tighten all nuts evenly until bezel sits
1.6 to 2.4 mm (1/16" to 3/32") off the front of the panel.