HIS
Business Manufacturing Company
Tel: (619) 447-0009 (800) 292-9831 Fax: (619) 447-4695
Web Site: www.hizbiz.com Email: [email protected]
5
Quick Set-Up
Pre-Installation Instructions
1. Inspect cable puller, power lines and surrounding area.
2. Clean-up cluttered work area before setting up cable puller.
3. Wear protective clothing. Loose clothing may be dangerous.
4. Check power supply. Recommended minimum is 3500 watts.
5. Whenever possible use a safety chain or anchor to hold puller down.
6. Check Locking Pins and Rope Sheaves.
(2“ conduit adapter shown)
Offset Conduit Adapters are designed to be rotated to mount flush in
housing box and are available in standard schedule #40, and schedule #80