Service and Maintenance
25
6.5.2 Load Cell Setup and Calibration.
The PRS80 console and load cell should be already been setup. However, it maybe necessary to
perform the following setup and calibration for maintenance or if you believe the load reading is
incorrect. Calibration is required when a new sensor is added or replaced.
If the load cell is not already added to the system, go to the section on
adding sensors
.
Two things must be done to setup a load cell. First, the type of load cell must be input into the
console. Second, the zero point of the load cell must be set.
6.5.2.A
Adding a Sensor
Menu selection - SETUP/SENSORS/
This gives the sensor select/information screen. It shows the status of all hardware. In the example
below "NOT IN." means that none of the sensors are installed.
Sensor status screen.
Choose the sensor that you wish to install and follow the onscreen instructions, which will ask you to
remove the paper tap insulating the battery contact or installing the batteries into the transmitter. To do
this, remove the 4 screws from the transmitter housing and remove the paper insulation tag that reads
“REMOVE BEFORE OPERATION” by holding the batteries in place with one hand and removing the
tag with the other or insert batteries, if not installed. If the batteries are already installed, pull or
disconnect one battery and reinstall to reset transmitter.
© Hirschmann PRS80 REV. D 11/08/10
190183_D.DOC
Summary of Contents for PRS 80
Page 1: ...www hirschmann com P N 031 300 190 183 Rev D 11 08 10 PRS 80 OPERATOR S SERVICE MANUAL ...
Page 2: ......
Page 4: ......
Page 6: ......