![Hirschmann PowerLION-24TP Installation Manual Download Page 57](http://html1.mh-extra.com/html/hirschmann/powerlion-24tp/powerlion-24tp_installation-manual_2138114057.webp)
A-3
Stack Troubleshooting
A
Stack Troubleshooting
If a stack fails to initialize or function, first check the following items:
• Check that all stacking cables are properly connected.
• Check if any stacking cables appear damaged.
• Check that only one Stack Master button is pressed in.
• Check that all switches in the stack are powered on.
After checking all items, reboot all the switches in the stack.
The switches allow you to configure ring- or line-topology stacking. When using
ring-topology stacking configuration and a switch fails, or a stacking cable is
disconnected, the entire stack reboots and resumes normal operation using
line-topology stacking through the remaining stack connections. Also, any changes
to the stack including powering down of a unit or the insertion of a unit causes the
stack to reboot.
Summary of Contents for PowerLION-24TP
Page 4: ......
Page 12: ...viii...
Page 16: ...xii Contents Glossary Index...
Page 18: ...xiv Tables...
Page 20: ...xvi Figures...
Page 36: ...2 8 Network Planning 2...
Page 46: ...3 10 Installing the Switch 3...
Page 58: ...A 4 Troubleshooting A...
Page 66: ...C 4 Specifications C Standards IEEE 802 3ae 10 Gigabit Ethernet...
Page 76: ...Index Index 4...
Page 77: ......
Page 78: ......