22
Installation OCTOPUS 8M/16M/24M/OS32
Release 11 01/2013
2
Device installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:
Unpacking and checking
Installing the SFP transceivers (optional)
Connecting the connector for supply voltage and signal contact
Installing the device
Grounding the device
Connecting the PoE supply voltage (optional)
Connecting the supply voltage, starting up
Connecting the data lines
Note:
Dust, moisture and fire protection is only achieved under the following
conditions:
All the unused connections and ports are closed with locking screws.
All the connectors and cables connected also fulfill protection class
IP65/67.
2.1
Unpacking and checking
Check whether the package includes all items named in chapter
“Scope
of delivery” on page 41
.
Check the individual parts for transport damage.
2.2
Installing the SFP transceivers (optional)
Note:
Only use SFP transceivers intended for the operation of OS32 devices
(see on page 42 “Accessories”)
.
You have the option to combine these transceivers with each other in any
way or also to leave SFP slots unoccupied.
Before attaching an SFP transceiver, first remove the protective cap over
the socket.
Push the SFP transceiver with the lock closed into the socket until you
hear it latch in.
Summary of Contents for OCTOPUS 8M Series
Page 44: ...44 Installation OCTOPUS 8M 16M 24M OS32 Release 11 01 2013...
Page 46: ......