Programming
© 2008 HIRSCHMANN Automation and Control GmbH · Branch Office Ettlingen · eMail: [email protected] · www.hirschmann-usa.com
18
50 650 19 0201e_Rev C (LinkBelt278).doc / 2008-08-18 / Rev. C / rk
< Start operation mode setup
The following illustrations define the symbols appearing on the display during the setup procedure.
Not all symbols will be shown, depending on the crane type and the answers to the questions.
•
Setting boom type configuration
If "DEL " was selected:
select boom type with the rotary
wheel and click wheel to confirm
main
boom
tip exten-
sion
hammer-
head
hammerhead
tip extension
jib
luffer
fixed jib