![Hirschmann BAT54-F User Manual Download Page 20](http://html1.mh-extra.com/html/hirschmann/bat54-f/bat54-f_user-manual_2138161020.webp)
20
BAT54-F
Release 12/07
2
Assembly and start-up
The devices have been developed for practical application in a harsh indus-
trial environment. The installation process is correspondingly simple.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:
X
Unpacking and checking
X
Setting up the device
X
Wall mounting
X
Pole mounting
X
Mounting/connecting external antennas
X
Connecting LAN and WLAN connections
X
Connecting the supply voltage
X
Grounding
X
Installing the data lines
X
Mounting the housing cover
X
Startup
X
Finding and configuring devices
2.1
Unpacking and checking
Check whether the contents of the package are complete
(see page 36
"Scope of delivery")
.
Check the individual parts for transport damage.
2.2
Installing the device
To protect the exposed contacts of the components still to be installed from
dirt, the individual system components must be connected in a dry and clean
area. Seal unused ports with the cover caps supplied.
Note:
Connectors are not electrical isolating devices.
Therefore, first plug the connector into the power supply plug and then switch
on the power supply.
Note:
Protection class IP67 is only achieved if all the connected components
also fulfill protection class IP67.
Summary of Contents for BAT54-F
Page 40: ...40 BAT54 F Release 12 07 ...
Page 42: ......