
1
1. PREPARATION BEFORE OPERATION
1.1 Unpacking and Checking of the Contents
When you have received the carton of the SM-8216 super megohmmeter,
carefully unpack it, and take out every thing from the carton.
Although the instrument and its accessories are severely inspected before
shipment from factory, visually check the items and their quantities.
Keep the shipping carton for reuse at a later time.
1) Visually check the external view of the instrument and its accessories.
2) Check the quantities of the list in accordance with the following list:
Table 1.1.1 List of Standard Accessories
Item Reference
No.
Q’ty
Remarks
Operation manual
−
1
This item means this booklet.
Power cord
−
1
Power cord with 3-prong plug
with third for grounding
Measuring rod
(Red)
0GE00002
1
A measuring rod with a 1-
meter cord to be connected to
the Rx ‘
‑
’ measuring terminal.
Measuring rod
(Black)
0GE00001
1
A measuring rod with a 1-
meter cord to be connected to
the Rx ‘
+
’ measuring terminal.
Shorting plug
−
1
A plug to be plugged to the
HV-EN connector on the rear of
the instrument. It is plugged
to the HV-EN connector when
shipping from factory.
Upon checking the instrument and accessories, if any damage is found,
immediately contact the forwarder or your local HIOKI distributor.
Upon checking the instrument and accessories, if any shortage is found,
immediately contact your local HIOKI distributor or directly HIOKI E.E.
CORPORATION .
CAUTION
When plugging the shorting plug, make sure that the power is turned
off, otherwise, there is an electric shock hazard.
Summary of Contents for SM-8216
Page 2: ......
Page 10: ...viii...
Page 42: ...30 9 EXTERNAL APPEARANCE Unit mm 222 D 190 H 280 W...
Page 43: ......