21
__________________________________________________
Chapter 2 Measurement Procedure
_____________________________________________
three-phase 3-lead
circuits
b
clamp all three leads of the circuit
b
E (PE)
a
Ig
a
PE
Load
device
NOTE
For measurement of single-phase 2-lead
circuits, clamp both leads of the circuit.
For measurement of three-phase 4-lead
circuits, clamp all four leads of the circuit. If
this is not possible, the measurement can also
be carried out on the ground lead of the
equipment.