18 Plow Assembly
Refer to drawing 6476. Remove the tape
from the black corrugated loom at the
points shown. Locate an Orange, Red, and
two Black wires. These wires connect to the
battery and motor solenoid. Remove the
four wires from approximately 33 inches of
the loom, making sure the Red and Black
wires are long enough to connect to the bat-
tery. Tuck these wires back into the loom as
shown in the drawing and retape the loom.
10. If there is no access hole in the drivers side
firewall then drill a 1-1/8 inch diameter hole.
Route the 7-pin circular connector through
the firewall into the cab compartment and
install the 4 inch grommet in the hole, if re-
quired.
CAUTION: Ensure that the relays will
clear any hood lift/spring mechanisms
before installation.
DWG NO. 6476A
Truck Battery On Driver Side
11. Select an area near the drivers side fend
er for the relays. Drill three 1/8” diameter
holes and secure the relays with #8 x 1/2
inch self-tapping screws from the hardware
bag in the parts box.
12. Splice the red with white stripe wire to the
vehicle’s switched 12 volt auxiliary electri-
cal circuit. This will prevent operation of the
plow without the vehicle key being on. This
wire controls the accessory relay that pow-
ers the control joystick and solenoids.
CAUTION: To prevent injury or prop-
erty damage caused by unintentional
plow movement when the key is re-
moved from the vehicle, the red/white striped
wire must be connected to a switched power
source on the vehicle. Connecting to a power
source not controlled by the ignition switch
will allow movement of the plow with the ve-
hicle key removed.