background image

 

 

 

GloFire 737 Wood Stove 

 

 
 

Installation and Operating Instructions 

 

Save These Instructions 

Tested to UL 1482 & ULC S627 by Intertek 

U.S EPA Phase II Certified Stove 

 

Henan Hi-Flame Metal Co. Ltd., Yugang Ave., Airport District, Zhengzhou, Henan, China 451163

Summary of Contents for GloFire 737

Page 1: ...Installation and Operating Instructions Save These Instructions Tested to UL 1482 ULC S627 by Intertek U S EPA Phase II Certified Stove Henan Hi Flame Metal Co Ltd Yugang Ave Airport District Zhengzh...

Page 2: ...ct local building fire officials or authority having jurisdiction about restrictions permit and installation inspection requirements in your area DO NOT INSTALL IN A MOBILE HOME DO NOT USE CHEMICALS O...

Page 3: ...spare parts and screws from the ash pan 3 Fix the flue collar on the outlet which you selected by using the M6 20 flat crosshead screw Ensure all seals are secure to prevent air leakage If you choose...

Page 4: ...US the floor protector must extend 8 beyond each side of the flue loading and ash removal opening and 16 to the front In Canada the floor protector must extend 8 200mm beyond each side and the back of...

Page 5: ...xpressed as R ii For multiple layers add R values of each layer to determine overall R value 3 If the overall R value of the system is greater than the R value of the specified floor protector the alt...

Page 6: ...the regulatory authority A combustible surface is anything that can burn i e sheet rock wall paper wood fabrics etc These surfaces are not limited to those that are visible and also include materials...

Page 7: ...densed or liquid creosote from running down the outside of the pipe or the stovetop All joints including the flue collar connection must be secured with three sheet metal screws to ensure that the sec...

Page 8: ...ated chimney is used the manufacturer s installation instructions must be followed You must also purchase from the same manufacturer and install the ceiling support package or wall pass through and T...

Page 9: ...cted by a professional Make sure there are no cracks loose mortar or other signs of deterioration and blockage Have the chimney cleaned before the stove is installed and operated When connecting the s...

Page 10: ...e removed to allow installation Chimney Height A masonry chimney or a listed factory build chimney must be the required height above the roof and any other nearby obstructions The chimney must be at l...

Page 11: ...ney connector and a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containing fi...

Page 12: ...s up to temperature NOTE The temperature gauge on the oven door is only a guide to the temperature in the oven We have found that when the gauge is reading around 100 degrees Celsius the internal oven...

Page 13: ...oncombustible floor or on the ground well away from all combustible materials pending final disposal If the ashes are disposed of by burial in soil or otherwise locally dispersed they should be retain...

Page 14: ...th 10mm sealing tape 9 Glass clip 10 Refractory glass 11 Door catch 12 Refractory handle 13 Bolt M8 75 14 Spin valve 15 Door 16 Ashpan 17 Bottom air inlet control 18 Grate 19 Grate frame 20 Baffle 21...

Page 15: ...s listed 5 The stove must have been continuously kept in a serviceable condition and you must not have allowed the stove to corrode 6 You must not have modified the construction of the stove in any wa...

Reviews: