HPE
HPE 800 W Flex Slot Platinum Hot-plug Low Halogen Power Supply
800 W Flex Slot Platinum Hot-plug Low Halogen Power Supply
Specification
Specification
Value
Value
Input requirements
Input requirements
—
Rated input voltage
100 VAC to 127 VAC
200 VAC to 240 VAC
240 VDC for China only
Rated input frequency
50 Hz to 60 Hz
Not applicable to 240 VDC
Rated input current
9.1 A at 100 VAC
4.4 A at 200 VAC
3.6 A at 240 VDC for China only
Maximum rated input power
899 W at 100 VAC
867 W at 200 VAC
864 W at 240 VDC for China only
BTUs per hour
3067 at 100 VAC
2958 at 200 VAC
2949 at 240 VAC for China only
Power supply output
Power supply output
—
Rated steady-state power
800 W at 100 VAC to 127 VAC input
800 W at 100 VAC to 240 VAC input
800 W at 240 VDC input for China only
Maximum peak power
800 W at 100 VAC to 127 VAC input
800 W at 100 VAC to 240 VAC input
800 W at 240 VDC input for China only
HPE 800 W Flex Slot Platinum Hot-plug Low Halogen Power Supply
244
Summary of Contents for ProLiant DL360 Gen10 Plus
Page 8: ...Component identification Component identification 8...
Page 29: ...HPE Basic Drive LED definitions 29...
Page 31: ...BIOS Platform Configuration RBSU Hot plug fans 31...
Page 36: ...Operations Operations 36...
Page 47: ...Remove the secondary PCI riser cage 47...
Page 54: ...Accessing the Systems Insight Display 54...
Page 55: ...Setup Setup 55...
Page 73: ...Hardware options installation Hardware options installation 73...
Page 108: ...Installing an 8SFF optical drive 108...
Page 122: ...Secondary PCI riser options Secondary PCI riser options 122...
Page 129: ...Full length Installing an expansion board in the secondary riser cage 129...
Page 135: ...Installing a type a Smart Array storage controller option 135...
Page 140: ...Processor and heatsink options Processor and heatsink options 140...
Page 149: ...4 LFF 11 Connect the cable Installing the Systems Insight Display power module 149...
Page 160: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 160...
Page 164: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 164...
Page 167: ...4 Proceed to Preparing the server for operation Installing the TPM board and cover 167...
Page 173: ...Cabling Cabling 173...
Page 177: ...Front power SID USB cabling Front I O cabling 177...
Page 178: ...Storage cabling Storage cabling 178...
Page 181: ...8SFF x4 2SFF backplanes to type p controller 8SFF x4 2SFF backplanes to type p controller 181...
Page 183: ...2SFF x4 backplane to primary NVMe riser 2SFF x4 backplane to primary NVMe riser 183...
Page 187: ...8SFF x4 backplane direct attach 8SFF x4 backplane direct attach 187...
Page 188: ...8SFF SAS SATA backplane to embedded SATA 8SFF SAS SATA backplane to embedded SATA 188...
Page 191: ...4LFF backplane to controllers 191...
Page 192: ...Software and configuration utilities Software and configuration utilities 192...
Page 221: ...Keeping the system current Keeping the system current 221...
Page 234: ...Troubleshooting Troubleshooting 234...
Page 238: ...Removing and replacing the system battery 238...
Page 251: ...Support and other resources Support and other resources 251...